Difference between revisions of "Hours 1011"
From DIDEAS Wiki
m |
m |
||
Line 10: | Line 10: | ||
**layout BS and encoders. | **layout BS and encoders. | ||
− | |||
− | |||
− | |||
=tue nov 2= | =tue nov 2= | ||
− | *-8pm | + | *9:20a -8pm |
=wed nov 3= | =wed nov 3= | ||
Line 26: | Line 23: | ||
**submitted IW10g | **submitted IW10g | ||
− | =thur nov | + | =thur nov 4= |
*1.5hr | *1.5hr | ||
**PCB design / layout, spi2asc1 improvements. | **PCB design / layout, spi2asc1 improvements. | ||
Line 34: | Line 31: | ||
**submitted IW10h | **submitted IW10h | ||
− | =fri nov | + | =fri nov 5= |
*10:30a-1:15p | *10:30a-1:15p | ||
**outline of memory map communications protocol. | **outline of memory map communications protocol. | ||
Line 41: | Line 38: | ||
**design review w/JS | **design review w/JS | ||
− | =sat nov | + | =sat nov 6= |
− | *12:30- | + | *12:30-8:0p |
**interview Jeff | **interview Jeff | ||
**interview Evelyn | **interview Evelyn | ||
Line 50: | Line 47: | ||
**investigate #8 encoder | **investigate #8 encoder | ||
− | =sun nov | + | =sun nov 7= |
*2 hrs | *2 hrs | ||
**relocate directories for SVN | **relocate directories for SVN | ||
Line 59: | Line 56: | ||
**develop design doc for calibration tables | **develop design doc for calibration tables | ||
− | =mon nov | + | =mon nov 8= |
*9am - 10:05a | *9am - 10:05a | ||
**meeting w/RC and GG on encoder; 2nd w/RC, GG, DG, DG, K re testing and manuf | **meeting w/RC and GG on encoder; 2nd w/RC, GG, DG, DG, K re testing and manuf | ||
Line 70: | Line 67: | ||
**worked w/AB and GG to debug PDA connection app. | **worked w/AB and GG to debug PDA connection app. | ||
− | =tue nov | + | =tue nov 9= |
*prepare AKENC3e documentation | *prepare AKENC3e documentation | ||
− | =wed nov | + | =wed nov 10= |
*PCBs and Dig will arrive | *PCBs and Dig will arrive |
Revision as of 13:35, 9 November 2010
- ceb_log todo BMdoc notes hours_1012 hours_1101 hours_1102 hours_1103 lifefix_log T
- garden12 ; emg_2009 ; Enc_2010 ; AKENC ; Kknee1 ; Br46_v1 gps1 ; lifefix ; battery ; loadwasher ; elecdog ; Brushless_control ; ceb_misc_prj ; pf_top_nav ; T
Contents
mon nov 1
- 1 hr
- layout ENC3e and programmer boards. Order pins.
- 11a - 8p
- test firmware re energy usage calcs
- discuss battery board w/CW
- discuss BS encoder w/DG
- layout BS and encoders.
tue nov 2
- 9:20a -8pm
wed nov 3
- 30 mins
- improve sensor programmer board mounting holes.
- 2:30p - 9:15p
- discuss project status w/AB
- discuss IW role w/RC
- meet w/BB
- submitted IW10g
thur nov 4
- 1.5hr
- PCB design / layout, spi2asc1 improvements.
- -8pm
- python intro to ZH, uses trajectory mode.
- discuss project status w/BB
- submitted IW10h
fri nov 5
- 10:30a-1:15p
- outline of memory map communications protocol.
- 3p - 5:30p
- discuss dashboard project w/ZH
- design review w/JS
sat nov 6
- 12:30-8:0p
- interview Jeff
- interview Evelyn
- discuss inteviews
- discuss punchlist and projects w/GG & RC
- partial assembly batrcp2
- investigate #8 encoder
sun nov 7
- 2 hrs
- relocate directories for SVN
- develop design doc for calibration tables
- 4pm - 8:15p
- cut PCBs for battery, partial assembly
- develop BOMs for battery boards. Complete digikey order.
- develop design doc for calibration tables
mon nov 8
- 9am - 10:05a
- meeting w/RC and GG on encoder; 2nd w/RC, GG, DG, DG, K re testing and manuf
- 11:45a - 10:15p
- discuss testing project w/BB
- discussion w/CW, KK, and GG re requirements
- finalize digikey order, locate new fuse holders
- develop batrcp2_iw10g documentation
- located 5 additional AKENC3d
- worked w/AB and GG to debug PDA connection app.
tue nov 9
- prepare AKENC3e documentation
wed nov 10
- PCBs and Dig will arrive