Difference between revisions of "Hours 1103"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 73: Line 73:
 
**submit IW11b
 
**submit IW11b
 
=thr mar 10=
 
=thr mar 10=
*5:20a-
+
*5:20a-6:55a
 +
**review H35 dataset.
 +
**SVN gerbers.

Revision as of 11:51, 10 March 2011

tue mar 1

  • 1:30p - -12:20am
    • test BATRCP4 boards
    • Btconfig development. wasn't working due to \n\r - needed to be \r
    • gerber development
    • work w/JV re linux robo config issue. find that on linux size of struct pack is different and need to include '='

wed mar 2

  • 9:00am - 10:50a
    • admin, emails
    • batrcp4 compilation
  • 12:30pm - 10:40pm -2
    • compile matlab scripts.
    • meet w/DG to discuss LTF 1/2 cycle causes and solutions. recommend addition of 0.2F caps on 48V, and that the IIR motor model in Copley is the problem - not the power supplies.
    • trying to order for RMB AM2049 samples. confirm that we have plenty of magnets (eg 200 of them)
    • work w/KM on debug of PSER and BATRCP
    • setup printer
    • work on batrcp4 package - compilation
    • work w/GG re #12, very interesting failure mode. meet w/JV and discuss and point out #12 failures.
    • solidworks quad mount

thur mar 3

  • 7:45am - 10am
    • emails, admin
  • 2:00p-8:30pm
    • planning meeting
    • meet w/CF re PCA
    • meet w/RC re PCA and then #12 torque issues

fri mar 4

  • 40 mins email, bom, gerber review
  • 12:30p - 8:45pm
    • meet w/CF re manuf files
    • create XLS for parts list
    • manually re-route issues with BATRCP4
    • meet w/INA
    • meet w/RB and AB re bootloader.

sat mar 5

  • 3hrs.
    • work on batrcp4 manual reroute, submit for DFM.
    • looking for DFM application.

sun mar 6

  • 6hrs
    • new PSER1 PCA
    • new PSER2he
    • work on batrcp4a layout

mon mar 7

  • 2hrs - work on batrcp4 layout, new PSER2hE
  • 1:10pm - 9pm
    • meet w/BB re keys and BL rate optimization
    • update python order script to produce a vendor HTML and a vendor-pn CSV file
    • work on layout of Batrcp4
    • review JW battery design w/RC

tue mar 8

  • 7:40a- 10am
    • review batrcp4 DFM, make corrections.
    • create BATRCP4 drawing. email package to CF.

wed mar 9

  • 1hr email, admin
  • 3:30pm-9:15pm
    • meet w/JV re comparison of KVF from linux and PC. find section name error w/phase_u
    • complete panalization and verification of PCB projects
    • submit IW11b

thr mar 10

  • 5:20a-6:55a
    • review H35 dataset.
    • SVN gerbers.