Hours 1102

From DIDEAS Wiki
Jump to: navigation, search

tue feb 1

    • swif24a design
    • verify other designs.
    • pcb submission

wed feb 2

    • pcb rework
    • swifi holder design and machining

thur feb 3

  • 9am - 8:50pm
    • pcb resubmission
    • solidworks swifi holder around rotational bolt.
    • V2 battery ESR measurements (RT and cold)

fri feb 4

  • 9am-10:15am
  • admin. emails.
  • 12pm -
    • meet w/TM
    • meet w/CF
    • meet
    • 4.5 hrs KM add to email.
    • meet w/KM training

sat feb 5

  • work in E15
  • 1hr w/RC discuss role and history.

sun feb 6

NA

mon feb 7

  • all day PCB design and submission

tue feb 8

  • 2 hrs
    • PCBs arrive

wed feb 9

  • 2:30pm - 9:15pm
    • meet w/
    • work w/KM to test
    • place digikey order for Rev 4 boards.
    • KM:4:10-9:10

thu feb 10

  • 3pm - 9pm???
    • motor meeting [1]

fri feb 11

  • 2:30pm - 8pm (working at MIT)

sat feb 12

  • NA

sun feb 13

  • NA

mon feb 14

  • 2:50p - 9:20p
    • review emails
    • datasheet for MRF24A PDF
    • investigate Rev 300++ schematics for needed ECOs.
    • receive #8 w/BS encorder from CA.
    • meet w/RB on flash write
    • meet w/GG, RC on project status
    • meet w/RC re position

tue feb 15

  • 10a-1:20p
    • emails, review Rev 300 emails
    • convert Rev 4 PCBs to artwork packages.
  • 1:30p -

wed feb 16

  • 10:00a-12:10pm
    • emails, admin
    • Pic32 knee controller development
    • work on land patterns for FPGA
  • 2:30pm - 11:55pm (-1hr dinner)
    • requirements review meeting
    • design review w/BB
    • new monitor.
    • work w/KM to assemble Pser2h, SWF24a
    • debug BATRCP4 and RN41
    • verify operation of PSER2hd.
    • initial testing of SWF24a

thur feb 17

  • 10a-8:20pm -1hr
    • bug list review
    • design review w/RB

fri feb 18

  • 15 min - discuss comm protocol w/RB
  • 2:30p - 10:55pm
    • develop new method for BS encoder wire routing

sat feb 19

  • 12:15 - 8:15p
    • w/KM on building up more robots with BS encoders.
    • develop python app to thrash robot overnight - and to monitor BS prediction

mon feb 21

  • 12p-9:30pm
    • encoder requirements
    • requirement meeting
    • solidworks - new benchtop plate
    • meet w/CF re manuf issues
    • new cable hydra cable drawing
    • improve thrash code and logging, start #26 but encoder non-functional.

tue feb 22

    • 2:30p-10:30
    • meet w/CF
    • new cable drawing

notes

  • ADISR2V4 on IW10F (2 of)
  • KKNEE2-r3 - 5-10-10 - IW10C
  • kknee2 - 5-7-10 - IW10B

wed feb 23

  • 7:30-10:30a
    • bsenc1 design
  • 2:30p - 11:40p
    • manufacturing meeting
    • iw, debug SC/MC not booting, and BS ECOs
    • assist with robot assembly

thur feb 24

  • 7:30a-1:15pm
    • bsenc2 design
    • verify gerbers
    • bugzilla meeting
  • 7pm-10:15pm
  • verify gerbers

fri feb 25

  • 7:30am - 10:30a
    • verify batmod4 gerbers
  • 3:30pm - ???
    • verify gerbers.

sat feb 26

  • 4 hrs
    • work on PCB gerbers

sun feb 27

  • 1.5 hrs
    • work on PCB gerbers

mon feb 28

  • 9:30a-12:10p
    • work on PCBs gerbers, email update
  • 4:30pm - 10:15pm
    • meet with IS
    • meet w/AB re DL python
    • meet w/RB re status
    • meet with JS re progress, future projects
    • verify status of #25
    • start thrash on #17, #26