Hours 1102

From DIDEAS Wiki
Revision as of 14:10, 22 February 2011 by Ceb (talk | contribs) (Created page with "{{ceb_private}} {{Ceb_prj}} =tue feb 1= **swif24a design **verify other deisgns. **pcb submission =wed feb 2= **pcb rework **swifi holder design and machining =thur feb 3= *9a...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

tue feb 1

    • swif24a design
    • verify other deisgns.
    • pcb submission

wed feb 2

    • pcb rework
    • swifi holder design and machining

thur feb 3

  • 9am - 8:50pm
    • pcb resubmission
    • solidworks swifi holder around rotational bolt.
    • V2 battery ESR measurements (RT and cold)

fri feb 4

  • 9am-10:15am
  • admin. emails.
  • 12pm -
    • meet w/TM
    • meet w/CF
    • meet
    • 4.5 hrs KM add to email.
    • meet w/KM training

sat feb 5

  • work in E15
  • 1hr w/RC discuss role and history.

tue feb 8

  • 2 hrs

wed feb 9

  • 2:30pm - 9:15pm
    • meet w/
    • work w/KM to test
    • place digikey order for Rev 4 boards.
    • KM:4:10-9:10

thu feb 10

  • 3pm - 9pm???
    • motor meeting [1]

fri feb 11

  • NA

sat feb 12

  • NA

sun feb 13

  • NA

mon feb 14

  • 2:50p - 9:20p
    • review emails
    • datasheet for MRF24A PDF
    • investigate Rev 300++ schematics for needed ECOs.
    • receive #8 w/BS encorder from CA.
    • meet w/RB on flash write
    • meet w/GG, RC on project status
    • meet w/RC re position
  • thur feb 15=
  • 10a-1:20p
    • emails, review Rev 300 emails
    • convert Rev 4 PCBs to artwork packages.
  • 1:30p -

wed feb 16

  • 10:00a-12:10pm
    • emails, admin
    • Pic32 knee controller development
    • work on land patterns for FPGA
  • 2:30pm - 11:55pm (-1hr dinner)
    • requirements review meeting
    • design review w/BB
    • new monitor.
    • work w/KM to assemble Pser2h, SWF24a
    • debug BATRCP4 and RN41
    • verify operation of PSER2hd.
    • initial testing of SWF24a

thur feb 17

  • 10a-8:20pm -1hr
    • bug list review
    • design review w/RB

fri feb 18

  • 15 min - discuss comm protocol w/RB
  • 2:30p - 10:55pm
    • develop new method for BS encoder wire routing

sat feb 19

  • 12:15 - 8:15p
    • w/KM on building up more robots with BS encoders.
    • develop python app to thrash robot overnight - and to monitor BS prediction

mon feb 21

  • 12p-9:30pm
    • encoder requirements
    • requirement meeting
    • solidworks - new benchtop plate
    • meet w/CF re manuf issues
    • new cable hydra cable drawing
    • improve thrash code and logging, start #26 but encoder non-functional.

tue feb 22

notes

  • ADISR2V4 on IW10F (2 of)
  • KKNEE2-r3 - 5-10-10 - IW10C
  • kknee2 - 5-7-10 - IW10B