Difference between revisions of "Hours 1101"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 169: Line 169:
 
**develop integer Pff in MC.  Find that MAC needs ints disabled.
 
**develop integer Pff in MC.  Find that MAC needs ints disabled.
 
**pcb design
 
**pcb design
 
=tue feb 1=
 
**swif24a design
 
**verify other deisgns.
 
**pcb submission
 
 
=wed feb 2=
 
**pcb rework
 
**swifi holder design and machining
 
 
=thur feb 3=
 
*9am - 8:50pm
 
**pcb resubmission
 
**solidworks swifi holder around rotational bolt.
 
**V2 battery ESR measurements (RT and cold)
 
 
=fri feb 4=
 
*9am-10:15am
 
*admin.  emails.
 
*12pm -
 
**meet w/TM
 
**meet w/CF
 
**meet
 
**4.5 hrs KM add to email.
 
**meet w/KM training
 
 
=sat feb 5=
 
*work in E15
 
*1hr w/RC discuss role and history.
 
 
=tue feb 8=
 
*2 hrs
 
 
=wed feb 9=
 
*2:30pm - 9:15pm
 
**meet w/
 
**work w/KM to test
 
**place digikey order for Rev 4 boards.
 
**KM:4:10-9:10
 
 
=thu feb 10=
 
*3pm - 9pm???
 
**motor meeting [http://www.google.com/search?q=transverse+flux]
 
 
=fri feb 11=
 
*NA
 
=sat feb 12=
 
*NA
 
=sun feb 13=
 
*NA
 
 
=mon feb 14=
 
*2:50p - 9:20p
 
**review emails
 
**datasheet for [http://ww1.microchip.com/downloads/en/DeviceDoc/70599B.pdf MRF24A PDF]
 
**investigate Rev 300++ schematics for needed ECOs.
 
**receive #8 w/BS encorder from CA.
 
**meet w/RB on flash write
 
**meet w/GG, RC on project status
 
**meet w/RC re position
 
 
*thur feb 15=
 
*10a-1:20p
 
**emails, review Rev 300 emails
 
**convert Rev 4 PCBs to artwork packages.
 
*1:30p -
 
 
=wed feb 16=
 
*10:00a-12:10pm
 
**emails, admin
 
**Pic32 knee controller development
 
**work on land patterns for FPGA
 
 
*2:30pm - 11:55pm (-1hr dinner)
 
**requirements review meeting
 
**design review w/BB
 
**new monitor.
 
**work w/KM to assemble Pser2h, SWF24a
 
**debug BATRCP4 and RN41
 
**verify operation of PSER2hd.
 
**initial testing of SWF24a
 
 
=thur feb 17=
 
*10a-8:20pm -1hr
 
**bug list review
 
**design review w/RB
 
 
=fri feb 18=
 
*15 min - discuss comm protocol w/RB
 
*2:30p - 10:55pm
 
**develop new method for BS encoder wire routing
 
 
=sat feb 19=
 
*12:15 - 8:15p
 
**w/KM on building up more robots with BS encoders.
 
**develop python app to thrash robot overnight - and to monitor BS prediction
 
 
=mon feb 21=
 
*12p-9:30pm
 
**encoder requirements
 
**requirement meeting
 
**solidworks - new benchtop plate
 
**meet w/CF re manuf issues
 
**new cable hydra cable drawing
 
**improve thrash code and logging, start #26 but encoder non-functional.
 
 
=tue feb 22=
 
==notes==
 
*ADISR2V4 on IW10F (2 of)
 
*KKNEE2-r3 - 5-10-10 - IW10C
 
*kknee2 - 5-7-10 - IW10B
 

Revision as of 14:10, 22 February 2011


sat jan 1

  • 9am - 11:30
    • look into motor temperature calculation issue
  • emails on ES stiffness, limits, and q15 calculations.
    • review motor temperature calculation
  • 12:30-2:30pm

mon jan 3

  • 10am - 10:45p

tue jan 4

  • 10:30a - 10p
    • go to binney - fixed imu and investigate swifi issue
    • Work w/bb on diag
    • work w/AB on PDA issues
    • investigate WB logging results w/RC
    • develope vibration shutdown code.

wed jan 5

  • 12:30p-9:15p
    • pick up machine from microcenter, set it up.
    • investigate WB logging results w/RC

thur jan 6

1.5hr home

  • 12:10p - 12:20am -1.5 hrs
    • assist at binney.
    • assist with PDA and toestrike
    • locate bug w/factory reset. work w/AB on a PDA correction.

fri jan 7

  • 11a - 1:45pm
  • 3:15p - 7pm

sat jan 8

  • 3hrs

sun jan 9

  • 2hrs

mon jan 10

  • 11a - 7:30p

tue jan 11

  • 12:00-8pm
  • design review of shorted leads
  • meet with BB re diag and bootloader

Wed jan 12

  • 10:45a - 2:00pm
    • design review meeting.
  • 7pm - 10:50pm
    • PDA toestrike bug and TS rescale bug fix

thu jan 13

  • 11:30a - 9:15p??? check phone call log
    • phone call w/RC re PDA issue and problem tuning at 222
    • measure battery ESR at 21C and -5C, start writing of a TR
    • meet w/JV to discuss logging data collection / reduction
    • meet w/AB to discuss future projects, PDA, eeprom logs.
    • merge bug fixes into firmware

fri jan 14

  • 10a - 12:40pm
    • contact GG and JS re firmware and battery voltage
    • create new battery_voltage_mv_ff with 1min tau, switch logging to make use if it.
    • verify new 1min tau...
  • 3:15p - 9:30pm

sat jan 15

  • 1hr

sun jan 16

  • 1hr

mon jan 17

tue jan 18

  • 1hr - email
    • AB re robo_config and new parser.
  • 3:30pm - 9pm???

wed jan 19

  • 9:15am - 10pm
    • planning meeting
    • solidworks design of swifi mount
    • meet w/AB re autotune, robo-config.

thur jan 20

  • 12pm - 6pm
    • planning meeting

fri jan 21

  • at RIC
    • dashboard 2hrs

sat jan 22

sun jan 23

  • 3hrs
    • dashboard compilation and testing

mon jan 24

  • 12pm-6pm
    • meeting w/ JW are logging infrastructure
    • meeting w/ ZH, RC, HH re TA


tue jan 25

  • 10am - 2:20pm
    • email coordination, IWK pcb mounting; solidworks models,
    • dashboard docs and distribution
    • solidworks install, locate old solidworks models
    • Bs encoder experiments.
  • 3pm - 11:15pm
    • meet with CF re solidworks - will waterjet by friday or hand-off (order materials.)
    • met with INA
    • KMA - learns tango SCH,PCB; reviews cables and wires. will review wire. appx 4 hrs
    • meet w/AB re auto-pci
    • meet w/GG re JD plan
    • implement ballnut position estimation in python

wed jan 26

  • 7:30am - 1pm
    • start to document ballnut encoder, continue code development
    • emails
  • 1:30p - 9:30pm
    • discuss DL progress w/BB
    • help diag robot that jumps into demux state 19
    • review microchip 802.11 board.
    • review knee w/DG; order flex cables
    • h22.b circuit board design
    • merge firmware

thu jan 27

snowstorm

  • 7:15a- 10:30a
  • 1pm-10:10p
    • pcb for battery and 22.b
    • script for CS to run continuously.

fri jan 28

  • 8:15a-10:30a
    • bat PCB design, emails
  • 12:05 - 9:40pm
    • meeting to discuss status of problem robots. #33 magnet, #39 stiffness, #28
    • PCB design
    • meet w/TMc re letter.
    • training of KMA

sat jan 29

  • 8a - 11a
    • BS encoder development and testing
  • 1:30pm - 5pm
    • testing of BS nut prediction
    • convert to integer

sun jan 30

  • 7:10a- 8pm
    • review overnight BS testing results, 311k good tests, 1 out of range (difference = 182)

mon jan 31

  • 7am - 8pm
    • develop integer Pff in MC. Find that MAC needs ints disabled.
    • pcb design