wed dec 1

9a - 10:30p

    • extend pre_build script to work with all controllers, add necessary support file to each project
    • work with JS and ZH to discover cause of IMU scaling problem
    • work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
    • work with KMa to assemble and test battery board set

thur dec 2

  • 9:15a - 8:15p -3
    • kit to L-tronics
    • update BOM and PCB docs.
    • meet w/RC and ZH re statemachine bug during TS
    • review diag code, email on issues.
    • complete integration of shared object into IMU
    • complete integration of serial number based scaling of IMU data.

fri dec 3

  • 9a - 1:40p
    • develope bt_config app
  • 3pm - 5:30pm
    • meet with RB re integration of test alg
    • meet with AB on PDA app
    • meet with JS on IMU operation and calb table.
    • meet with RC on status

sat dec 4

  • 10a - 12:30
    • develope BATRCP3 inspection and test procedure.
  • 1:30p - 10:30p
    • work with Khang on board assembly
    • work w/DG on inspection / test procedure
    • revise BATMOD3 BOM

todo

  • knees to MIT
  • reboot PC
  • rename BATMOD3s
  • email GG re CA inspection, CC K and DG
  • order digikey parts for BATMOD

sun dec 5

  • 11:30a - 8:40p
    • write testing procedure for batrcp
    • debug batrcp3.#0107
    • full bat system validation, tested charger

mon dec 6

  • 8:10a - 10:30p (-45min)
    • work out plan for getting BATMOD3 assembled.
    • python calibration tables
    • testing of BATMOD3, serialization
    • photo graph BATMOD3 and BATRCP3 and package for CenCoat, work w/DkG on same
    • DigK overnight order for BATMOD3
    • work w/ZH on TS detector.
    • work on profiler
    • testing calb tables.

tue dec 7

  • 9:15a - 12:40p
    • merge profile support
    • calb table integration
    • integrate KM into soldering of wires onto boards tonight.
  • 1:30p - 1:25a
    • extract documents from CA, work w/KA to assemble wires into boards
    • document pyshared objects
    • debug #22
    • support for new KVF files
    • debug BT lock up issue