Difference between revisions of "Hours 1012"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 2: Line 2:
 
{{Ceb_prj}}
 
{{Ceb_prj}}
  
=dec 1=
+
=wed dec 1=
 
9a - 10:30p
 
9a - 10:30p
 
**extend pre_build script to work with all controllers, add necessary support file to each project
 
**extend pre_build script to work with all controllers, add necessary support file to each project
Line 8: Line 8:
 
**work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
 
**work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
 
**work with KMa to assemble and test battery board set
 
**work with KMa to assemble and test battery board set
=dec 2=
+
=thur dec 2=
 
*9:15a - 8:15p    -3
 
*9:15a - 8:15p    -3
 
**kit to L-tronics
 
**kit to L-tronics
Line 16: Line 16:
 
**complete integration of shared object into IMU
 
**complete integration of shared object into IMU
 
**complete integration of serial number based scaling of IMU data.
 
**complete integration of serial number based scaling of IMU data.
 +
 +
=fri dec 3=
 +
*9a - 1:40p
 +
**develope bt_config app
 +
 +
*3pm - 5:30pm
 +
**meet with RB re integration of test alg
 +
**meet with AB on PDA app
 +
**meet with JS on IMU operation and calb table.
 +
**meet with RC on status
 +
 +
=sat dec 4=
 +
*10a - 12:30
 +
**develope BATRCP3 inspection and test procedure.
 +
 +
*1:30p - 10:30p
 +
**work with Khang on board assembly
 +
**work w/DG on inspection / test procedure
 +
**revise BATMOD3 BOM
 +
 +
==todo==
 +
*knees to MIT
 +
*reboot PC
 +
*rename BATMOD3s
 +
*email GG re CA inspection, CC K and DG
 +
*order digikey parts for BATMOD
 +
 +
=sun dec 5=
 +
*11:30a - 8:40p
 +
**write testing proceedure for batrcp
 +
**debug batrcp3.#0107
 +
**full bat system validation, tested charger
 +
**

Revision as of 02:23, 6 December 2010

wed dec 1

9a - 10:30p

    • extend pre_build script to work with all controllers, add necessary support file to each project
    • work with JS and ZH to discover cause of IMU scaling problem
    • work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
    • work with KMa to assemble and test battery board set

thur dec 2

  • 9:15a - 8:15p -3
    • kit to L-tronics
    • update BOM and PCB docs.
    • meet w/RC and ZH re statemachine bug during TS
    • review diag code, email on issues.
    • complete integration of shared object into IMU
    • complete integration of serial number based scaling of IMU data.

fri dec 3

  • 9a - 1:40p
    • develope bt_config app
  • 3pm - 5:30pm
    • meet with RB re integration of test alg
    • meet with AB on PDA app
    • meet with JS on IMU operation and calb table.
    • meet with RC on status

sat dec 4

  • 10a - 12:30
    • develope BATRCP3 inspection and test procedure.
  • 1:30p - 10:30p
    • work with Khang on board assembly
    • work w/DG on inspection / test procedure
    • revise BATMOD3 BOM

todo

  • knees to MIT
  • reboot PC
  • rename BATMOD3s
  • email GG re CA inspection, CC K and DG
  • order digikey parts for BATMOD

sun dec 5

  • 11:30a - 8:40p
    • write testing proceedure for batrcp
    • debug batrcp3.#0107
    • full bat system validation, tested charger