Difference between revisions of "Hours 1012"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 9: Line 9:
 
**work with KMa to assemble and test battery board set
 
**work with KMa to assemble and test battery board set
 
=dec 2=
 
=dec 2=
*9:15a - 7:55p   -3
+
*9:15a - 8:15p   -3
 
**kit to L-tronics
 
**kit to L-tronics
 
**update BOM and PCB docs.
 
**update BOM and PCB docs.

Revision as of 01:12, 3 December 2010

dec 1

9a - 10:30p

    • extend pre_build script to work with all controllers, add necessary support file to each project
    • work with JS and ZH to discover cause of IMU scaling problem
    • work with AB on bluetooth/android - seems to be related to timing and flow control in the BT
    • work with KMa to assemble and test battery board set

dec 2

  • 9:15a - 8:15p -3
    • kit to L-tronics
    • update BOM and PCB docs.
    • meet w/RC and ZH re statemachine bug during TS
    • review diag code, email on issues.
    • complete integration of shared object into IMU
    • complete integration of serial number based scaling of IMU data.