Difference between revisions of "Upd 2x0 218 controller"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 13: Line 13:
  
 
== 200-218-005==
 
== 200-218-005==
 +
 
* location (IW)
 
* location (IW)
 
* 4-16-09 : SHORTED R233 and R222 to enable local VBAT MEASUREMENT.  DONT CONNECT EXTERNAL BATTERY CABLE
 
* 4-16-09 : SHORTED R233 and R222 to enable local VBAT MEASUREMENT.  DONT CONNECT EXTERNAL BATTERY CABLE

Revision as of 03:14, 15 June 2009

ALL BOARDS NEED R233 and R222 shorted (solder ball)

SC/MC 2x0-218 PCA

200-218-001

200-218-003

  • 4-27-09 : will start testing.
  • needs R233 and R222 shorted (solder ball)

200-218-005

  • location (IW)
  • 4-16-09 : SHORTED R233 and R222 to enable local VBAT MEASUREMENT. DONT CONNECT EXTERNAL BATTERY CABLE
  • location ceb benchtest (MIT), used for code dev

200-218-006

  • 4-25-09 : has problem with MC reset
  • 4-2-09 : start bench test at 3:10am (w/217-006), finished 2pm - works well!


200-218-007

  • 4-6-09 : start bench test at 2am; finished 9:10pm (w/217-007) works well.

200-218-008

  • location (6-1-09) - used for CEB code development at lab


200-218-009

200-218-010

  • 4-2-09 : ran bench test for 1.5 hrs with 217-010