== 200-218-003==
 +
* 4-27-09 : will start testing. 
 +
* needs R233 and R222 shorted (solder ball)
  
 
== 200-218-005==
 
== 200-218-005==

Revision as of 17:10, 27 April 2009

SC/MC 2x0-218 PCA

200-218-001

200-218-003

  • 4-27-09 : will start testing.
  • needs R233 and R222 shorted (solder ball)

200-218-005

  • 4-16-09 : SHORTED R233 and R222 to enable local VBAT MEASUREMENT. DONT CONNECT EXTERNAL BATTERY CABLE
  • location ceb benchtest (MIT), used for code dev

200-218-006

  • 4-25-09 : has problem with MC reset
  • 4-2-09 : start bench test at 3:10am (w/217-006), finished 2pm - works well!


200-218-007

  • 4-6-09 : start bench test at 2am; finished 9:10pm (w/217-007) works well.


200-218-009

200-218-010