Difference between revisions of "Hours 1005"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 95: Line 95:
  
 
==mon may 17==
 
==mon may 17==
*9:00a-
+
*9:00a-10:30p  -1.5
 
**change config bit - ADC cs working, WDT
 
**change config bit - ADC cs working, WDT
 +
**routing of RMK3B1 compatable
 +
**change sample rate to 50khz, review ADC noise distro - rather large (+-200 LSBs!)
 +
 +
==tue may 18==
 +
*7:10a -
 +
**RMK3b1 layout, make measurements on holder

Revision as of 11:43, 18 May 2010

MAY 2010

sat may 1

3.5 hrs - renishaw development - develope IC code

sun may 2

  • 2 hrs, how to connect SSI to P32
  • 8pm - 10:45p
    • develope renishaw SSI code, timing
    • servo robot, observe IC outputs, collect data on velocity, matlab analysis


mon may 3

  • 3 hrs - meet with HH and GG re SM

tue may 4

  • 15 min - discuss FF with DG
  • 15 min w/HH

wed may 5

  • 11am to 10pm working on RLS


thur may 6

  • 8:45a -
  • 10 hrs
    • RMB replacement design.
    • on w/CA on details of how to have wire leave the PCA

fri may 7

  • 12 hrs
    • discuss no-component areas of PCB w/CA and CW.
    • re-layout
    • finalize RMB desin that uses 16 bits bi-polar differential ADCs
    • finalize the RMB replacement. submit PCBs for fab. need to submit silk screens

sat may 8

  • 6 hrs
    • created new AKENC4 using the AM256Q

sun may 9

  • 6 hrs
    • started writing code for AKENC, found problems in the PCBs
    • corrected problems in akenc2 and akenc3 pcbs.
    • updated parts data base for akenc, in preparation for the order.

mon may 10

  • 12 hrs
    • discuss with SPE the state of affairs for the PCAs
    • continue rework of akencX,
    • add DAC to akenc4
    • document ECOs for use of SSI on Rev300 hardware.
    • digikey parts order
    • software development for akencX

tue may 11

  • 8:45a - 10pm
    • code development for XLP and AM8192
    • deal with fedex on delivery delays
    • start assembly and testing ENC3
    • apply ENC ECOs to SC-300-10, begin testing
    • bring up UART

wed may 12

  • 9:50a-10pm
    • code testing
    • cut PCBs (-2.5 hrs misc at mit)
    • dinner w/RC. (-1hr)
    • move equipment to new space.

thur may 13

9:50am - 10:50 pm

    • look for QNF28 ZIF, contact various sources for availability
    • complete assembly
    • debug EEPROM emulation for AM8192
    • fix RLS power on circut (was stuck on due to very required Vgsth)
    • place digikey order for ZIF

fri may 14

  • 9:30a - 1:15pm
    • rewrite IIC emulator statemachine

sat may 15

  • 10am - 4pm -45
    • iic emulator


sun may 16

  • 8:45- 10:30pm, -1.5
    • completed IIC emulator
    • debug SSI interface
    • looking into ADC CS issue

mon may 17

  • 9:00a-10:30p -1.5
    • change config bit - ADC cs working, WDT
    • routing of RMK3B1 compatable
    • change sample rate to 50khz, review ADC noise distro - rather large (+-200 LSBs!)

tue may 18

  • 7:10a -
    • RMK3b1 layout, make measurements on holder