Difference between revisions of "Hours 1005"
From DIDEAS Wiki
m |
m |
||
Line 57: | Line 57: | ||
**software development for akencX | **software development for akencX | ||
− | ==tue may 11= | + | ==tue may 11== |
− | *8:45a - | + | *8:45a - 10pm |
**code development for XLP and AM8192 | **code development for XLP and AM8192 | ||
**deal with fedex on delivery delays | **deal with fedex on delivery delays | ||
**start assembly and testing ENC3 | **start assembly and testing ENC3 | ||
**apply ENC ECOs to SC-300-10, begin testing | **apply ENC ECOs to SC-300-10, begin testing | ||
+ | **bring up UART | ||
+ | ==wed may 12= | ||
+ | *9:50a- |
Revision as of 13:56, 12 May 2010
Contents
MAY 2010
sat may 1
3.5 hrs - renishaw development - develope IC code
sun may 2
- 2 hrs, how to connect SSI to P32
- 8pm - 10:45p
- develope renishaw SSI code, timing
- servo robot, observe IC outputs, collect data on velocity, matlab analysis
mon may 3
- 3 hrs - meet with HH and GG re SM
tue may 4
- 15 min - discuss FF with DG
- 15 min w/HH
wed may 5
- 11am to 10pm working on RLS
thur may 6
- 8:45a -
- 10 hrs
- RMB replacement design.
- on w/CA on details of how to have wire leave the PCA
fri may 7
- 12 hrs
- discuss no-component areas of PCB w/CA and CW.
- re-layout
- finalize RMB desin that uses 16 bits bi-polar differential ADCs
- finalize the RMB replacement. submit PCBs for fab. need to submit silk screens
sat may 8
- 6 hrs
- created new AKENC4 using the AM256Q
sun may 9
- 6 hrs
- started writing code for AKENC, found problems in the PCBs
- corrected problems in akenc2 and akenc3 pcbs.
- updated parts data base for akenc, in preparation for the order.
mon may 10
- 12 hrs
- discuss with SPE the state of affairs for the PCAs
- continue rework of akencX,
- add DAC to akenc4
- document ECOs for use of SSI on Rev300 hardware.
- digikey parts order
- software development for akencX
tue may 11
- 8:45a - 10pm
- code development for XLP and AM8192
- deal with fedex on delivery delays
- start assembly and testing ENC3
- apply ENC ECOs to SC-300-10, begin testing
- bring up UART
=wed may 12
- 9:50a-