Hours 1002

From DIDEAS Wiki
Revision as of 15:17, 3 February 2010 by Ceb (talk | contribs)
Jump to: navigation, search

todo

  • adjust current scale factor for R300
  • test overload monitor
  • how many CPU cycles are we using.
  • verify LDWASH2 operation
  • order parts for PSERs
  • shipping label for Ltronics.
  • BOM for Rev200 SC

FEB 2010

mon feb 1

  • 1.5 hrs -
    • document overload, and MC filter, email GG on same
    • apply bug fixes to spld3 firmware
  • 1pm - (-40 mins) 12:20 am
    • discuss LTF w/DG, set up JR3 and charge amp software to perform experiments to confirm moment sensitivity
    • work w/CA debugging FET boards.
    • work w/GG testing overload monitor
    • testing FF and documenting
    • trying to understand why change amp digital and analog disagree. Seems that force measured digitally changes when the scale factor is changed.at

tue feb 2

  • 1.5 hr : admin and development of option parser for benchtest. Discuss HALT testing w/RC
  • 0.5 :
  • 5:30-11pm (-40 -10 -30)
    • visit the HALT chamber
    • assist CA w/testing of repair Rev200 PCA.
    • benchtest wasn't able to run the stress test.
    • adding pyramid code to benchtest
    • modification and testing of V2 code for use in HALT.

wed feb 3

  • 15 min, review force field code, SVN submission. Email on same to GG.
  • purchase Skype phone.