Difference between revisions of "Hours 1002"
From DIDEAS Wiki
m (→mon feb 15) |
m |
||
Line 147: | Line 147: | ||
**rebuilt bench test | **rebuilt bench test | ||
**email re status | **email re status | ||
+ | |||
+ | =tue feb 16= | ||
+ | *15 misn admin, emails | ||
+ | *30 mins review LTF status, modify LTF history plotter, emails | ||
+ | *at IW 6:45p- (-45 phone, -30 dinner) | ||
+ | **meet with RC and char, discuss MC model tests. | ||
+ | **setup I5 | ||
+ | **develop dataport code to output model |
Revision as of 05:24, 17 February 2010
Contents
todo
- adjust current scale factor for R300
- how many CPU cycles are we using.
- verify LDWASH2 operation
- order parts for PSERs
- shipping label for Ltronics.
- BOM for Rev200 SC
- HALT motor temp measurement
- Read FET thermister
- Read IMU thermister
FEB 2010
mon feb 1
- 1.5 hrs -
- document overload, and MC filter, email GG on same
- apply bug fixes to spld3 firmware
- 1pm - 12:20a (-40 mins)
- discuss LTF w/DG, set up JR3 and charge amp software to perform experiments to confirm moment sensitivity
- work w/CA debugging FET boards.
- work w/GG testing overload monitor
- testing FF and documenting
- trying to understand why change amp digital and analog disagree. Seems that force measured digitally changes when the scale factor is changed.at
tue feb 2
- 1.5 hr : admin and development of option parser for benchtest. Discuss HALT testing w/RC
- 0.5 :
- 5:30-11pm (-40 -10 -30)
- visit the HALT chamber
- assist CA w/testing of repair Rev200 PCA.
- benchtest wasn't able to run the stress test.
- adding pyramid code to benchtest
- modification and testing of V2 code for use in HALT.
wed feb 3
- 15 min, review force field code, SVN submission. Email on same to GG.
- purchase Skype phone.
- 10:45a - 8pm
- halt chamber
- return to IW, assist GG w/SM and boot. New robot needed calibration tables and Init table config.
thur feb 4
- 10:45a- 1:45p (-20)
- discuss re LTF w/DG, why was it stopped.
- assist GG w/S4 issue re telemetry.
- modifications to RLFv2, add new logging file
- 3pm - 11p
- modify log class to not use time stamps, and optionally insert headers
- discuss JR3 LTF mode with DG and ED, discuss Jython w/ED
- discuss charger and TI IC w/DkG
- successful pole test of V2. SG has opposite sign
- live matlab plotting of LTF data, build plot_lifefix.exe
- Capacitor voltage : [1]
fri feb 5
- 9:15am - 10:45a
- email to GG re V2 SM and how it was tested.
- admim, VPN to IW.
- email to DG re ideas for new FF tables in the LTF.
- 12:30p-1:45p
- setup LTF room XP box for data collection
- after building with deploytool, need to run MCRInstaller to install run time libs. [2]
- 3:20p-9:10p
- complete setup of LTF XP box. Building ML versions of plotters.
- ordered PC
- work w/GG on V2 SM
- tested new thrust vector and PVT files
- sent BOM for new Rev200 PCAs.
sat feb 6
- 12:50p - 1:25p
- review LTF, diagnose failure, email to DG.
- 4:25p-6pm
- investigate LTF failure
- setup and test Skype phone.
- BOM for SC/MC
sun feb 7
- zero
mon feb 8
- complete Jan invoice.
- 3:15p - 8:30p -20
- V2 statemachine improvements. E2L issue due to hardstop
- discuss LTF w/DG
- develop new method to zero the LTF
- connect 600W PS to Aeon PC
- startup LTF
- discuss w/RC V2, LTF, and spring status
tue feb 9
- 2:30 p - 8:35pm
- ???
- extend dataport variable count, now sending 40 'dataport' bytes between SC/MC
- extend MC to with 'qForce' variable that is a force reading sent over serial port
- looking for dataport comm bug that breaks SC-MC, revered until found working.
wed feb 10
- 1:15p - 11:05p -60 - 15 -30
- ????
- +15 review SCH re EC2023, emails to GG, DG,
thr feb 11
- 60 mins
- email w/CA re batteries, email w/MR re ECO2023, email GG re/R200 rebuilt.
- discuss w/RC LTF LW, JR3, and BC,MC model integration
- 3:30p - 2:05a
- cleanly code new dataport firmware and test. find, fix bug related to datatype sice.
- attempt to test LTF JR3 serial to MC, not completed. modify_plot ltf
- experiment with new PVT files, find tracking is terrible
- create generic program to import text files into ML, then create python code that makes a custom version of the text file importer and added to the wifi_fast .zip log file.
- improve wifi_fast. makes use of a new wifiload modules
fri feb 12
- 12:05p - 8:15-
- develop code for MC to send dereferenced variable list
- build monowall router
- test LTF after new tube, discover range of motion is limited - cant PF. likely miss alignment
- debug plot_lifefix to work with new long packet.
- start LTF w/tube act.
sat feb 13
- 45 mins review LTF, setup newly compiled LTF-ML plotter for LTF
sun feb 14
- 60 prepare mono machine
- 1:20p-4:30p
- setup and test mono router for bridge to 87
- discuss network, router status w/ED
- research ipsec bridge.
mon feb 15
- 60 mins - phone w/ED, work on mono IPSEC bridge.
- 1:30p- 8:30p
- review LTF status, dicuss w/RC
- V2 code development, testing
- 10:00p-10:30p
- rebuilt bench test
- email re status
tue feb 16
- 15 misn admin, emails
- 30 mins review LTF status, modify LTF history plotter, emails
- at IW 6:45p- (-45 phone, -30 dinner)
- meet with RC and char, discuss MC model tests.
- setup I5
- develop dataport code to output model