Difference between revisions of "Hours 1002"

From DIDEAS Wiki
Jump to: navigation, search
m
m (sat feb 6)
Line 80: Line 80:
 
**setup and test Skype phone.
 
**setup and test Skype phone.
 
**BOM for SC/MC
 
**BOM for SC/MC
 +
 +
==sun feb 7==
 +
*zero
 +
 +
==mon feb 8==
 +
* complete Jan invoice.

Revision as of 18:05, 8 February 2010

todo

  • adjust current scale factor for R300
  • how many CPU cycles are we using.
  • verify LDWASH2 operation
  • order parts for PSERs
  • shipping label for Ltronics.
  • BOM for Rev200 SC
  • HALT motor temp measurement
  • Read FET thermister
  • Read IMU thermister

FEB 2010

mon feb 1

  • 1.5 hrs -
    • document overload, and MC filter, email GG on same
    • apply bug fixes to spld3 firmware
  • 1pm - (-40 mins) 12:20 am
    • discuss LTF w/DG, set up JR3 and charge amp software to perform experiments to confirm moment sensitivity
    • work w/CA debugging FET boards.
    • work w/GG testing overload monitor
    • testing FF and documenting
    • trying to understand why change amp digital and analog disagree. Seems that force measured digitally changes when the scale factor is changed.at

tue feb 2

  • 1.5 hr : admin and development of option parser for benchtest. Discuss HALT testing w/RC
  • 0.5 :
  • 5:30-11pm (-40 -10 -30)
    • visit the HALT chamber
    • assist CA w/testing of repair Rev200 PCA.
    • benchtest wasn't able to run the stress test.
    • adding pyramid code to benchtest
    • modification and testing of V2 code for use in HALT.

wed feb 3

  • 15 min, review force field code, SVN submission. Email on same to GG.
  • purchase Skype phone.
  • 10:45a - 8pm
    • halt chamber
    • return to IW, assist GG w/SM and boot. New robot needed calibration tables and Init table config.

thur feb 4

  • 10:45a- 1:45p (-20)
    • discuss re LTF w/DG, why was it stopped.
    • assist GG w/S4 issue re telemetry.
    • modifications to RLFv2, add new logging file
  • 3pm - 11p
    • modify log class to not use time stamps, and optionally insert headers
    • discuss JR3 LTF mode with DG and ED, discuss Jython w/ED
    • discuss charger and TI IC w/DkG
    • successful pole test of V2. SG has opposite sign
    • live matlab plotting of LTF data, build plot_lifefix.exe
    • Capacitor voltage : [1]

fri feb 5

  • 9:15am - 10:45a
    • email to GG re V2 SM and how it was tested.
    • admim, VPN to IW.
    • email to DG re ideas for new FF tables in the LTF.
  • 12:30p-1:45p
    • setup LTF room XP box for data collection
    • after building with deploytool, need to run MCRInstaller to install run time libs. [2]
  • 3:20p-9:10p
    • complete setup of LTF XP box. Building ML versions of plotters.
    • ordered PC
    • work w/GG on V2 SM
    • tested new thrust vector and PVT files
    • sent BOM for new Rev200 PCAs.

sat feb 6

  • 12:50p - 1:25p
    • review LTF, diagnose failure, email to DG.
  • 4:25p-6pm
    • investigate LTF failure
    • setup and test Skype phone.
    • BOM for SC/MC

sun feb 7

  • zero

mon feb 8

  • complete Jan invoice.