Hours 0912

From DIDEAS Wiki
Revision as of 07:31, 11 December 2009 by Ceb (talk | contribs)
Jump to: navigation, search

Dec 2009

todo

  • STAR MARKET - thyme packets,
  • order flex cables
  • make PCBs for eddy current sense
  • measure resistance on boot (incorporate into mode2)
  • implement thermal model, w/updates from resistance measurement.
  • get LF potential function
  • add "text code" into the ASC output from SWIFI
  • pickle with robo config to make parameter restoration easier.

tue dec 1

wed dec 2

thu dec 3

  • 15 min : phone discussion w/GG re lifefix
  • 15 min : phone discussion w/HH and GG re operation of PP



fri dec 4

  • 45 mins on eddy current sensor - calculate inductance and Q factor.
  • 1:10 discuss w/GG overview of the lifefix, and derivatives of the linear hall sensor
  • 30 mins analyze linear hall sensor data, email plots and assessment

notes


sat dec 5

  • working on knee code

sun dec 6

  • 30 mins - experiments with Eddy current sensor.
  • working on knee code

mon dec 7

  • 1pm - 5:20p
    • meet w/ HH and GG to explore tuning and PFF
    • meet w/ GG to discuss code
    • discuss EMI freqs w/DkG

tue dec 8

  • 1pm - 6.30p
    • tuning w/HH
    • code mods w/GG
    • assist w/BT issue
    • assist w/LF issues
    • looking into cause of LF UDP to PC issue

wed dec 9

  • 10 min discussion w/RC re lifefix interlock
  • 2pm - 7pm
    • set running of LF, resulting on motor overheat
    • continue LF discussion, stratagies for avoiding failures
  • 9:20-2am
    • add retry for motor temperature measurment
    • exponential increase in cooling time
    • modify firmware to open motor leads in mode 0
    • add jr3 min, max to run lifefix

thur dec 10

  • 10am - 12n
    • code improvements re run_lifefix_v2 (add time difference)
    • SVN updates re lifefix
    • discuss w/ED JR3 issue
    • discuss w/RC re MILE status
  • 12:30p - 1:45p
    • will add code to encoder position and drift.
    • added code to zero the LFrobot motor current
    • discuss w/DG LF status and motor needs, will build 2nd LFrobot for testing. we will run potential function
  • 6:15p - 8:45p
    • disuss w/GG and DG lifefix improvements
    • test and improve lifefix code, looking into cause of JR3 timing anomoly.
  • 11:00p - 1:45a
    • work with MILE encoder