Hours 0912

From DIDEAS Wiki
Revision as of 22:47, 7 December 2009 by Ceb (talk | contribs)
Jump to: navigation, search

Dec 2009

todo

  • order flex cables
  • make PCBs for eddy current sense
  • measure resistance on boot (incorporate into mode2)
  • implement thermal model, w/updates from resistance measurement.
  • incorporate JR3 into LF
  • get LF potential function
  • for LF, if ABS - INC encoder error, then don't drop into mode 0!
  • add "text code" into the ASC output from SWIFI
  • pickle with robo config to make parameter restoration easier.

tue dec 1

wed dec 2

thu dec 3

  • 15 min : phone discussion w/GG re lifefix
  • 15 min : phone discussion w/HH and GG re operation of PP



fri dec 4

  • 45 mins on eddy current sensor - calculate inductance and Q factor.
  • 1:10 discuss w/GG overview of the lifefix, and derivatives of the linear hall sensor
  • 30 mins analyze linear hall sensor data, email plots and assessment

notes


sat dec 5

  • working on knee code

sun dec 6

  • 30 mins - experiments with Eddy current sensor.
  • working on knee code

mon dec 7

  • 1pm - 5:20p
    • meet w/ HH and GG to explore tuning and PFF
    • meet w/ GG to discuss code
    • discuss EMI freqs w/DkG