Difference between revisions of "Hours 0912"

From DIDEAS Wiki
Jump to: navigation, search
m
m (wed dec 16)
Line 170: Line 170:
 
==notes==
 
==notes==
 
*http://www.gridconnect.com/wi.html
 
*http://www.gridconnect.com/wi.html
 +
 +
 +
=thur dec 17=
 +
*9am - 11:15 pm -1 -30
 +
**LTF analysis, documenting in wiki
 +
**assistance w/GG HH re spld tuning
 +
**assist with writing code for spld
 +
**discuss LTF w/DG
 +
**perform LTF sine sweep and analysis.

Revision as of 04:17, 18 December 2009

Dec 2009

todo

  • run experiment to verify INC and MILE
  • save step response with static_test.py
  • make more BT boards
  • hall sensor for knee
  • matlab plot INI file.
  • digikey: order flex cables,
  • make PCBs for eddy current sense
  • measure resistance on boot (incorporate into mode2)
  • implement thermal model, w/updates from resistance measurement.
  • get LF potential function
  • add "text code" into the ASC output from SWIFI
  • pickle with robo config to make parameter restoration easier.


tue dec 1

wed dec 2

thu dec 3

  • 15 min : phone discussion w/GG re lifefix
  • 15 min : phone discussion w/HH and GG re operation of PP



fri dec 4

  • 45 mins on eddy current sensor - calculate inductance and Q factor.
  • 1:10 discuss w/GG overview of the lifefix, and derivatives of the linear hall sensor
  • 30 mins analyze linear hall sensor data, email plots and assessment

notes


sat dec 5

  • working on knee code

sun dec 6

  • 30 mins - experiments with Eddy current sensor.
  • working on knee code

mon dec 7

  • 1pm - 5:20p
    • meet w/ HH and GG to explore tuning and PFF
    • meet w/ GG to discuss code
    • discuss EMI freqs w/DkG

tue dec 8

  • 1pm - 6.30p
    • tuning w/HH
    • code mods w/GG
    • assist w/BT issue
    • assist w/LF issues
    • looking into cause of LF UDP to PC issue

wed dec 9

  • 10 min discussion w/RC re lifefix interlock
  • 2pm - 7pm
    • set running of LF, resulting on motor overheat
    • continue LF discussion, stratagies for avoiding failures
  • 9:20-2am
    • add retry for motor temperature measurment
    • exponential increase in cooling time
    • modify firmware to open motor leads in mode 0
    • add jr3 min, max to run lifefix

thur dec 10

  • 10am - 12n
    • code improvements re run_lifefix_v2 (add time difference)
    • SVN updates re lifefix
    • discuss w/ED JR3 issue
    • discuss w/RC re MILE status
  • 12:30p - 1:45p
    • will add code to encoder position and drift.
    • added code to zero the LFrobot motor current
    • discuss w/DG LF status and motor needs, will build 2nd LFrobot for testing. we will run potential function
  • 6:15p - 8:45p
    • disuss w/GG and DG lifefix improvements
    • test and improve lifefix code, looking into cause of JR3 timing anomaly.
  • 11:00p - 1:45a
    • work with MILE encoder

fri dec 11

  • 10am - 9pm -0.5 -1.15
    • phone w/ED re how to get MC to get past commutation, fix the code
    • at IW to help with LF
    • assist DG and CA to make in-system motor resistance measurement - seems to be lots of variability
    • improvements to LF code.
      • command line options to set min run interval and total run duration
      • small thrust will zero motor current and reduce PI parameters


    • phone w/RN re boost conveter, review HR_PWM module for dspic


sat dec 12

  • 11a-1pm
    • reviewing charge amp code for how errors are processed, code up improvements and partially test
    • review LF status, send email
  • 2:30p - 9pm
    • testing Rev300 SC/MC, testing mile encoder
    • modify SC and MC code to work on Rev300 hardware
    • get bench test program running.

sun dec 13

  • 10a - 2:30 p
    • testing the EEPROM keys, add support into benchtest
    • verify keys can run a script file
    • make use of the keys in motor_init, etc.
    • experiment with playing JR3 output as a sound file.
    • email DG re status of fixture.
    • fix issue with mile encoder firmware.

mon dec 14

  • 10am - 1:30 am (yes ~15 hrs) - 45 mins
    • prepare for meeting with RC and RN
    • RC boost converter pre-meeting
    • RC & RN meeting
    • GG, DkG, RC battery and system architecture meeting
    • meeting with DG re lifefix.
    • create lifefix static_test program

notes

tue dec 15

  • 10am - 10pm - 1hr
    • emails re LTF status
    • static_test.py development
    • email GG re swifi plotting, and how to change data
    • discussion with RC re GG software project
    • at IW, assist GG with PP hold software
    • discuss w/RC bio results and compare with robot.
    • work with DG on LTF experiment
    • continue static test development, logging of data, start (multi hour) run.

wed dec 16

  • 11a - 1:30p
    • review LTF data, write view program for DG, send email summary.
  • 2:30p - 7pm (-20)
    • send CA info on order Wiport, setup BT wiki page.
    • discuss w/GG operation of robot 'sensors.c'
    • discuss w/ED status of move_ecat
    • improve charge amp class to do automatic tx read
    • various emails.
    • change static_test to zero charge amp only at the start, and call move_ecat only once per position change
    • re-run static_test with better force measurement
  • 30 mins
    • review INC-MILE data, document the encoder difference
    • review LFT static test status

notes


thur dec 17

  • 9am - 11:15 pm -1 -30
    • LTF analysis, documenting in wiki
    • assistance w/GG HH re spld tuning
    • assist with writing code for spld
    • discuss LTF w/DG
    • perform LTF sine sweep and analysis.