Difference between revisions of "Hours 0912"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 88: Line 88:
 
**phone w/ED re how to get MC to get past commutation, fix the code
 
**phone w/ED re how to get MC to get past commutation, fix the code
 
**at IW to help with LF
 
**at IW to help with LF
**assist DG and CA to make in-system motor resistance measurment - seems to be lots of variability
+
**assist DG and CA to make in-system motor resistance measurement - seems to be lots of variability
 
** improvements to LF code.   
 
** improvements to LF code.   
 
***command line options to set min run interval and total run duration
 
***command line options to set min run interval and total run duration
Line 100: Line 100:
 
=sat dec 12=
 
=sat dec 12=
 
* 11a-1pm  
 
* 11a-1pm  
** reviewing charge amp code for how errors are processed, code up improvments and partially test
+
** reviewing charge amp code for how errors are processed, code up improvements and partially test
 
** review LF status, send email
 
** review LF status, send email
*2:30p -
+
*2:30p - 9pm
 
**testing Rev300 SC/MC, testing mile encoder
 
**testing Rev300 SC/MC, testing mile encoder
 +
**modify SC and MC code to work on Rev300 hardware
 +
**get bench test program running.
 +
 +
= sun dec 13=
 +
*10a - 2:30 p
 +
** testing the EEPROM keys, add support into benchtest
 +
** verify keys can run a script file
 +
** make use of the keys in motor_init, etc.
 +
** experiment with playing JR3 output as a sound file.
 +
** email DG re status of fixture.
 +
 +
*4p -
 +
** matlab compilation of plot_lifefix to standalone
 +
** developing procedure to bring up new boards.  [[Benchtest_users#prepare_a_new_board]]
 +
 +
==notes==
 +
*http://www.mathworks.com/support/solutions/en/data/1-1I5TNS/index.html
 +
*C:\Program Files\Microsoft Visual Studio 8\VC\bin
 +
*c:/Program Files/MATLAB/R2007b/bin/win32/mexopts/msvc80engmatopts.bat

Revision as of 22:54, 13 December 2009

Dec 2009

todo

  • STAR MARKET - thyme packets,
  • order flex cables
  • make PCBs for eddy current sense
  • measure resistance on boot (incorporate into mode2)
  • implement thermal model, w/updates from resistance measurement.
  • get LF potential function
  • add "text code" into the ASC output from SWIFI
  • pickle with robo config to make parameter restoration easier.

tue dec 1

wed dec 2

thu dec 3

  • 15 min : phone discussion w/GG re lifefix
  • 15 min : phone discussion w/HH and GG re operation of PP



fri dec 4

  • 45 mins on eddy current sensor - calculate inductance and Q factor.
  • 1:10 discuss w/GG overview of the lifefix, and derivatives of the linear hall sensor
  • 30 mins analyze linear hall sensor data, email plots and assessment

notes


sat dec 5

  • working on knee code

sun dec 6

  • 30 mins - experiments with Eddy current sensor.
  • working on knee code

mon dec 7

  • 1pm - 5:20p
    • meet w/ HH and GG to explore tuning and PFF
    • meet w/ GG to discuss code
    • discuss EMI freqs w/DkG

tue dec 8

  • 1pm - 6.30p
    • tuning w/HH
    • code mods w/GG
    • assist w/BT issue
    • assist w/LF issues
    • looking into cause of LF UDP to PC issue

wed dec 9

  • 10 min discussion w/RC re lifefix interlock
  • 2pm - 7pm
    • set running of LF, resulting on motor overheat
    • continue LF discussion, stratagies for avoiding failures
  • 9:20-2am
    • add retry for motor temperature measurment
    • exponential increase in cooling time
    • modify firmware to open motor leads in mode 0
    • add jr3 min, max to run lifefix

thur dec 10

  • 10am - 12n
    • code improvements re run_lifefix_v2 (add time difference)
    • SVN updates re lifefix
    • discuss w/ED JR3 issue
    • discuss w/RC re MILE status
  • 12:30p - 1:45p
    • will add code to encoder position and drift.
    • added code to zero the LFrobot motor current
    • discuss w/DG LF status and motor needs, will build 2nd LFrobot for testing. we will run potential function
  • 6:15p - 8:45p
    • disuss w/GG and DG lifefix improvements
    • test and improve lifefix code, looking into cause of JR3 timing anomaly.
  • 11:00p - 1:45a
    • work with MILE encoder

fri dec 11

  • 10am - 9pm -0.5 -1.15
    • phone w/ED re how to get MC to get past commutation, fix the code
    • at IW to help with LF
    • assist DG and CA to make in-system motor resistance measurement - seems to be lots of variability
    • improvements to LF code.
      • command line options to set min run interval and total run duration
      • small thrust will zero motor current and reduce PI parameters


    • phone w/RN re boost conveter, review HR_PWM module for dspic


sat dec 12

  • 11a-1pm
    • reviewing charge amp code for how errors are processed, code up improvements and partially test
    • review LF status, send email
  • 2:30p - 9pm
    • testing Rev300 SC/MC, testing mile encoder
    • modify SC and MC code to work on Rev300 hardware
    • get bench test program running.

sun dec 13

  • 10a - 2:30 p
    • testing the EEPROM keys, add support into benchtest
    • verify keys can run a script file
    • make use of the keys in motor_init, etc.
    • experiment with playing JR3 output as a sound file.
    • email DG re status of fixture.

notes