Difference between revisions of "Hours 0911"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 13: Line 13:
 
* add "text code" the ASC output from SWIFI
 
* add "text code" the ASC output from SWIFI
 
=mon nov 2=
 
=mon nov 2=
*11:emails
+
*10:25a-
**
+
* emails re plans for today. locate robots, MW re ankle block diagram.
 +
** contact Alena re locating robots
 +
** review rev300 schematics, contact MR, make minor changes to IMU
 +
** complete and mail invoice
 +
 
 
=sun nov 1=
 
=sun nov 1=
 
*11:50a-4:20pm  
 
*11:50a-4:20pm  
Line 21: Line 25:
 
**work on invoice.
 
**work on invoice.
 
**meet w/PB re O2meter.
 
**meet w/PB re O2meter.
**review some of the datasets from track study, make sure there are .m, .py tools copied over to assist.
+
**review some data sets from track study, make sure there are .m, .py tools copied over to assist.

Revision as of 18:07, 2 November 2009

Oct 2009

todo

  • finalize schematics for MPD
  • motor position function generator
  • measure resistance on boot (incorporate into mode2)
  • implement thermal model, w/updates from resistance measurement.
  • order 10k arrays from digikey.!!!!!!!!
  • get LF potential function
  • for LF, if ABS - INC encoder error, then don't drop into mode 0!
  • add "text code" the ASC output from SWIFI

mon nov 2

  • 10:25a-
  • emails re plans for today. locate robots, MW re ankle block diagram.
    • contact Alena re locating robots
    • review rev300 schematics, contact MR, make minor changes to IMU
    • complete and mail invoice

sun nov 1

  • 11:50a-4:20pm
    • deliver cable to track.
    • SVN updates.
    • work on invoice.
    • meet w/PB re O2meter.
    • review some data sets from track study, make sure there are .m, .py tools copied over to assist.