Difference between revisions of "Hours 0911"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 4: Line 4:
  
 
==todo==
 
==todo==
 +
* finalize schematics for MPD
 +
* motor position function generator
 +
* measure resistance on boot (incorporate into mode2)
 +
* implement thermal model, w/updates from resistance measurement.
 
* order 10k arrays from digikey.!!!!!!!!
 
* order 10k arrays from digikey.!!!!!!!!
* measure drop across D14 (pg 11) SC/MC
 
* function generator for Sat
 
 
* get LF potential function
 
* get LF potential function
 
* for LF, if ABS - INC encoder error, then don't drop into mode 0!
 
* for LF, if ABS - INC encoder error, then don't drop into mode 0!
 
* add "text code" the ASC output from SWIFI
 
* add "text code" the ASC output from SWIFI
* review schematics for MPD
 
 
  
 
=sun nov 1=
 
=sun nov 1=
Line 18: Line 18:
 
**SVN updates.
 
**SVN updates.
 
**work on invoice.
 
**work on invoice.
 +
**meet w/PB re O2meter.

Revision as of 17:43, 1 November 2009

Oct 2009

todo

  • finalize schematics for MPD
  • motor position function generator
  • measure resistance on boot (incorporate into mode2)
  • implement thermal model, w/updates from resistance measurement.
  • order 10k arrays from digikey.!!!!!!!!
  • get LF potential function
  • for LF, if ABS - INC encoder error, then don't drop into mode 0!
  • add "text code" the ASC output from SWIFI

sun nov 1

  • 11:50a-
    • deliver cable to track.
    • SVN updates.
    • work on invoice.
    • meet w/PB re O2meter.