=SC/MC testing=
+
=SCREWS=
* apply power with FUP power cable to MC FUP.
+
** IMU PCB mount 50 mills
* connect wired (or BT) to SC FUP
+
** side plates (sholder screws) : 2.5mm
*
+
** K2 spring to ball nut / actuator : 2mm
 +
** K3 spring : 7/64"
 +
** front / back cover :  5/64"
 +
** belt tension adjust : 50 mills
  
  
=FET testing=
+
[[AIW_preassembly]]
* connect FET to known good SC/MC with flex cable.
 
 
 
 
 
 
 
 
 
=pyramid verification=
 
* connect P to working SC
 
 
 
 
 
 
 
 
 
=assembly=
 
*run motor tests over night, installed in side plates
 
*actuator - measure / adjust belt tension - record value and date it.
 
  
 +
=BT / Swiffy=
 +
*Using FUP1 board, interface 9pin Rev 200 FUP to BT FUP
 +
**Connect BT to FUP1 w/ 5pin straight cable, into the RED (straight) header.
 
*run BT communications wire
 
*run BT communications wire
  
 +
==before K3==
 +
*insert both programming cables
 
*wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
 
*wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
 
*red lock tight pyramid tube adapter into WOW pack
 
*red lock tight pyramid tube adapter into WOW pack
  
 
* connect BT mod to flexF midpoint, make sure to correct module for left vs right.
 
* connect BT mod to flexF midpoint, make sure to correct module for left vs right.

Latest revision as of 17:51, 14 October 2009

PF Users Navigation:

Edit

SCREWS

    • IMU PCB mount 50 mills
    • side plates (sholder screws) : 2.5mm
    • K2 spring to ball nut / actuator : 2mm
    • K3 spring : 7/64"
    • front / back cover : 5/64"
    • belt tension adjust : 50 mills


AIW_preassembly

BT / Swiffy

  • Using FUP1 board, interface 9pin Rev 200 FUP to BT FUP
    • Connect BT to FUP1 w/ 5pin straight cable, into the RED (straight) header.
  • run BT communications wire

before K3

  • insert both programming cables
  • wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
  • red lock tight pyramid tube adapter into WOW pack
  • connect BT mod to flexF midpoint, make sure to correct module for left vs right.