Difference between revisions of "Upd 2x0 218 controller"
From DIDEAS Wiki
m (→200-218-005) |
m |
||
Line 11: | Line 11: | ||
*location ceb benchtest (MIT), used for code dev | *location ceb benchtest (MIT), used for code dev | ||
− | == 200-218-006== | + | == 200-218-006==\ |
+ | * 4-25-09 : has problem with MC reset | ||
* 4-2-09 : start bench test at 3:10am (w/217-006), finished 2pm - works well! | * 4-2-09 : start bench test at 3:10am (w/217-006), finished 2pm - works well! | ||
Revision as of 16:42, 27 April 2009
Contents
SC/MC 2x0-218 PCA
200-218-001
- location AK-WB2
200-218-005
- 4-16-09 : SHORTED R233 and R222 to enable local VBAT MEASUREMENT. DONT CONNECT EXTERNAL BATTERY CABLE
- location ceb benchtest (MIT), used for code dev
== 200-218-006==\
- 4-25-09 : has problem with MC reset
- 4-2-09 : start bench test at 3:10am (w/217-006), finished 2pm - works well!
200-218-007
- 4-6-09 : start bench test at 2am; finished 9:10pm (w/217-007) works well.
200-218-009
- location AK-WB1 ???
200-218-010
- 4-2-09 : ran bench test for 1.5 hrs with 217-010