Difference between revisions of "Hours 1008"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 129: Line 129:
 
**firmware development - SW Tstrike alg w/ZH
 
**firmware development - SW Tstrike alg w/ZH
 
**HH firmware upgrade and tuning.  Low pff experiments.
 
**HH firmware upgrade and tuning.  Low pff experiments.
 +
 +
==thur aug 19==
 +
*1pm -
 +
**tuning w/HH- discover issues with #5, needed to be rebuilt; and calb stopped.
 +
**assist with debug of new robots and tuning
 +
**investigate TS algorithm w/matlab; implement in C
 +
**investigate LSP state and torque drop at other FS.  Can it be detected?
 +
**how about the loadcell sensor - can we use it?

Revision as of 23:56, 19 August 2010

tue aug 3

  • 11:10a - 5p -15
    • implement adjustable parameters for hardstop and beta angles
    • discuss project status w/RC and HH
    • implement new (untested) relaxed mode.
    • discuss project status w/HH and relax mode
  • 8:50p-10:30p
    • review PCBs for fabrication


wed aug 4

  • 9:00a - 11:30 -30
    • discuss relaxed mode w/GG
    • review IMU code in SM, begin use of IMU for swing detection
    • review PCBs for fabrication
  • 12:15p - 11:40p
    • review code changes w/GG
    • attempt to solve problem #7, #11
    • tuning w/subject J
    • review data for #7, #11.

todo

  • need to verify what PSER1s we have and what if any ECOs
  • have 12 PSER1eb (010310)
  • have 3 PSER1e2 (021609)


thur aug 5

  • 10a-12:40p
    • discuss project status w/RC, HH
    • implement new relaxed mode
  • 1:10p-8:30p
    • test new relaxed mode
    • explain tuning new tuning parameters.
    • capture torque verify data from #11 in TX,
  • 9:45p-11:40p
    • work w/GG on code updates in TX, create release 3a

fri aug 6

  • 1pm - 1:40p
  • 3:30p - 9:15p
    • investigate issue w/calb_stop traced to magnet rotation;
    • calbed several robots;
    • investigate st 4-5 glitch.
    • tested firmware on subject; created tag; shipped

sat aug 7

  • 11:15a - 6:15p
    • stop by Binney - get items; then better set up my office.
    • work w/HH
    • investigate ES->LS glitch

sun aug 8

  • 3pm - 10:15
    • work w/HH, fixed ES->LS glitch
    • prepare H2-04, H2-21 run calb stop and torque verify.

mon aug 9

  • 11a - 7:15p -1 hr
  • assist GG w/ tune issue on 12. motor temp wildly varies; needed to adjust k3bias.

tue aug 10

  • 9:30a - 10:30p - 1 hr
    • tested H2-12, verified motor turn error in back driven.
    • shipped H2-14
    • new relaxed mode w/pitch vel

wed aug 11

  • 9:45a - 12:45p
    • sketch clustering algorithm
    • class-afty the torque_verify for integration in ED back drive stepper
  • 1:10p-11:30p -1.5 hr
    • firmware dev, screen to set parameters by weight. relaxed hardstop exit, make relaxed torques and pitch vel adjustable.
    • explain torque verify to ED.
    • firmware review w/GG
    • HH takes 5prelease 2 home.

thur aug 12

  • 9:45a - 9:30p -30
    • discuss ES-LS current glitch and solution. code firmware to perform experiment requested by RC
    • recode demux SM to retry if there is excessive torque at boot
    • calbstop #4, #5
    • discuss SM bug w/GG

fri aug 13

  • 10:10a - 1:30p
    • calbstop #1
    • smooth relaxed mode exit.
  • 3p-9pm
    • improve relaxed mode firmware.
    • assist GG w/turning subjects
    • document key binds.
    • review spring stiffness calb.
    • begin analysis of pitch velocity vs speed

sat aug 14

  • 2pm - 9pm
    • code PV vs speed

sun aug 15

  •  ???? - 9:15p - 45
    • improve Pff vs speed alg, testing w/HH

mon aug 16

  • 1pm - 9:30p -30
    • improve Pff vs speed alg
    • long discussion of RLS issues
    • subject tuning

tue aug 17

  • 8:50a - 1:25p -15
    • improve wifilog file name processing
    • firmware development RLS sensor mitigation, notification and latching in SC
  • 2:30p - 9:45p -15
    • assist w/TB tuning
    • update robo_config
    • discuss w/ZH ideas for simplified PV adaptation

wed aug 18

  • 4:15-9:30
    • assist GG w/WB tuning
    • firmware development - SW Tstrike alg w/ZH
    • HH firmware upgrade and tuning. Low pff experiments.

thur aug 19

  • 1pm -
    • tuning w/HH- discover issues with #5, needed to be rebuilt; and calb stopped.
    • assist with debug of new robots and tuning
    • investigate TS algorithm w/matlab; implement in C
    • investigate LSP state and torque drop at other FS. Can it be detected?
    • how about the loadcell sensor - can we use it?