Difference between revisions of "Hours 1007"
From DIDEAS Wiki
m |
m |
||
Line 1: | Line 1: | ||
{{ceb_private}} | {{ceb_private}} | ||
− | =tue jul 6= | + | ==wed jun 30== |
+ | *7:15a- | ||
+ | *worked all day. | ||
+ | **work on invoice until ~1pm | ||
+ | **testing of instant on, investigate FLASH memory. | ||
+ | |||
+ | |||
+ | ==thur jul 1== | ||
+ | * worked all morning | ||
+ | **investigate use of flash memory for calb tables | ||
+ | **forums re getting assistance | ||
+ | *7p - | ||
+ | **meet w/RC to discuss project status | ||
+ | |||
+ | |||
+ | ==fri jun 2== | ||
+ | *9a - 1p | ||
+ | **invesitate read/write flash, issues with linker, issues with realice. | ||
+ | **power on SM development | ||
+ | **investiage code merge | ||
+ | |||
+ | |||
+ | *4:30p - 9:30p | ||
+ | **at IW | ||
+ | **code merge and testing of same | ||
+ | **create special command hooks for JS firmware | ||
+ | **investigate / work around issue with power off SM forcing demux SM state. | ||
+ | |||
+ | ==sat jul 3== | ||
+ | *1hr - | ||
+ | **project documentation, sync w/GG JS on merge status. | ||
+ | *2 hrs | ||
+ | ** complete assembly and test AKENC3m | ||
+ | *2.5 | ||
+ | ** email DS re calb stop | ||
+ | ** power on SG simulation in matlab | ||
+ | ** experiment w/write flash | ||
+ | |||
+ | |||
+ | ==tue jul 6== | ||
*10:25a - | *10:25a - | ||
**discuss project priorities w/RC | **discuss project priorities w/RC | ||
**integrating FF instant on, | **integrating FF instant on, | ||
− | =wed jul 7= | + | ==wed jul 7== |
*5:15a-6:35 | *5:15a-6:35 | ||
**improve calb stop to make use of true north. | **improve calb stop to make use of true north. | ||
Line 20: | Line 59: | ||
**re-implemented cmd 1480 - for readback of MILE. | **re-implemented cmd 1480 - for readback of MILE. | ||
*1 hr - at home | *1 hr - at home | ||
− | =thur jul 8= | + | |
+ | |||
+ | ==thur jul 8== | ||
*9:50a-1:20p | *9:50a-1:20p | ||
**work to make instant on MC backward compatible w/LTF | **work to make instant on MC backward compatible w/LTF | ||
Line 33: | Line 74: | ||
**interview AB | **interview AB | ||
− | =fri jul 9= | + | ==fri jul 9== |
*9a - 1p | *9a - 1p | ||
** | ** | ||
Line 41: | Line 82: | ||
**issue with H2-04 | **issue with H2-04 | ||
− | =sat jul 10= | + | ==sat jul 10== |
*1 hr | *1 hr | ||
**trajectory simulation, moving into motor space. | **trajectory simulation, moving into motor space. | ||
Line 54: | Line 95: | ||
**mc_diag development. | **mc_diag development. | ||
− | =sun jul 11= | + | ==sun jul 11== |
*4 hrs | *4 hrs | ||
**install matlab | **install matlab | ||
**sc - no calb - development. | **sc - no calb - development. | ||
− | =mon jul 12= | + | ==mon jul 12== |
*11:30a-10:15p -2 -1 | *11:30a-10:15p -2 -1 | ||
**study Excell w/ZH firmware. find uses xlsread which requires COM server. Openoffice doesnt work. | **study Excell w/ZH firmware. find uses xlsread which requires COM server. Openoffice doesnt work. | ||
Line 65: | Line 106: | ||
**trajectory ctrl development | **trajectory ctrl development | ||
− | =tue jul 13= | + | ==tue jul 13== |
*6:50a - 7:50a | *6:50a - 7:50a | ||
**debug trajectory ctrl | **debug trajectory ctrl | ||
Line 71: | Line 112: | ||
**debug trajectory ctrl, connect to mc_statemachine state 42. | **debug trajectory ctrl, connect to mc_statemachine state 42. | ||
− | =wed jul 14= | + | ==wed jul 14== |
− | =thr jul 15= | + | ==thr jul 15== |
*3pm - 10:30p -1hr | *3pm - 10:30p -1hr | ||
**discuss w/RC and GG re status | **discuss w/RC and GG re status | ||
Line 81: | Line 122: | ||
**add longer waiting MC boot state when no calb table; SC motor commands for traject | **add longer waiting MC boot state when no calb table; SC motor commands for traject | ||
− | =fri jul 16= | + | ==fri jul 16== |
*10:30a - | *10:30a - | ||
− | =sat jul 17= | + | ==sat jul 17== |
* | * | ||
**calb_stop improvements, change COMREF to mode4, correctly normalize theta_beta poly calc | **calb_stop improvements, change COMREF to mode4, correctly normalize theta_beta poly calc | ||
− | =sun jul 18= | + | ==sun jul 18== |
*11:50a - | *11:50a - | ||
**improve read_calb_table | **improve read_calb_table | ||
**work on the script | **work on the script | ||
− | =mon jul 19= | + | ==mon jul 19== |
*2:00p - 5:15 -15 | *2:00p - 5:15 -15 | ||
**investigate effect of velocity measurement on oscillation freq. | **investigate effect of velocity measurement on oscillation freq. | ||
Line 99: | Line 140: | ||
**experiments / verification of setting incremental encoder via command 1490\ | **experiments / verification of setting incremental encoder via command 1490\ | ||
− | =tue jul 20= | + | ==tue jul 20== |
*4:45 hrs | *4:45 hrs | ||
**phone w/ED re dataport sel | **phone w/ED re dataport sel | ||
Line 107: | Line 148: | ||
**discuss w/RC pyramid and torque control | **discuss w/RC pyramid and torque control | ||
− | =wed jul 21= | + | ==wed jul 21== |
*9:45a- | *9:45a- |
Revision as of 13:49, 21 July 2010
Contents
wed jun 30
- 7:15a-
- worked all day.
- work on invoice until ~1pm
- testing of instant on, investigate FLASH memory.
thur jul 1
- worked all morning
- investigate use of flash memory for calb tables
- forums re getting assistance
- 7p -
- meet w/RC to discuss project status
fri jun 2
- 9a - 1p
- invesitate read/write flash, issues with linker, issues with realice.
- power on SM development
- investiage code merge
- 4:30p - 9:30p
- at IW
- code merge and testing of same
- create special command hooks for JS firmware
- investigate / work around issue with power off SM forcing demux SM state.
sat jul 3
- 1hr -
- project documentation, sync w/GG JS on merge status.
- 2 hrs
- complete assembly and test AKENC3m
- 2.5
- email DS re calb stop
- power on SG simulation in matlab
- experiment w/write flash
tue jul 6
- 10:25a -
- discuss project priorities w/RC
- integrating FF instant on,
wed jul 7
- 5:15a-6:35
- improve calb stop to make use of true north.
- trajectory simulation
- 12:30p - 7:55p
- assist DG w/LTF - commutation issue
- discuss battery options w/CA and Mk
- assist GG w/osc caused by FF and ISLIP interaction, need ability to read MILE and to set commref.
- MILE doesn't seem to read w/cmd 1106
- will need a commutation MC state - for LTF etc
- start implementation of traj onto MC
- re-implemented cmd 1480 - for readback of MILE.
- 1 hr - at home
thur jul 8
- 9:50a-1:20p
- work to make instant on MC backward compatible w/LTF
- CMD 1480 to read SSI sensors, modify bench test and support to make use of
- calb_stop has analog sensor offset output
- would like to integrate into some of the other tests
- TODO - calb_stop for HALT
- work to make instant on MC backward compatible w/LTF
- 2:15p- 9pm
- discuss w/RC boost prj
- merge SS into trunk
- LTF2 has SC 2745, MC 2718; will update w/latest.
- interview AB
fri jul 9
- 9a - 1p
- 3p-9:30
- work at IW
- calb stop improvements, w/GG to integrate into procedure.
- issue with H2-04
sat jul 10
- 1 hr
- trajectory simulation, moving into motor space.
- 12:30p - 8:15p
- work at IW
- discuss calb fixture w/RC, DG
- discuss global opt toolbox w/ZH, RC and ED - need to DL from mathworks. - need passwords.
- start diag development for benchtest. rework iochan_capture.py, save files for S3, H2-04
- C:\xxx\0svn\data-collection\iochan_capture
- C:\xxx\0svn\data-collection\calb_stop
- study trajectory issues with initial conditions
- mc_diag development.
sun jul 11
- 4 hrs
- install matlab
- sc - no calb - development.
mon jul 12
- 11:30a-10:15p -2 -1
- study Excell w/ZH firmware. find uses xlsread which requires COM server. Openoffice doesnt work.
- assist ED w/calb fixture dev
- trajectory ctrl development
tue jul 13
- 6:50a - 7:50a
- debug trajectory ctrl
- 10:50a -
- debug trajectory ctrl, connect to mc_statemachine state 42.
wed jul 14
thr jul 15
- 3pm - 10:30p -1hr
- discuss w/RC and GG re status
- discuss w/RC batteries
- calb stop improvement
- integrate trajectory into SW
- add longer waiting MC boot state when no calb table; SC motor commands for traject
fri jul 16
- 10:30a -
sat jul 17
-
- calb_stop improvements, change COMREF to mode4, correctly normalize theta_beta poly calc
sun jul 18
- 11:50a -
- improve read_calb_table
- work on the script
mon jul 19
- 2:00p - 5:15 -15
- investigate effect of velocity measurement on oscillation freq.
- 8:45-10:30p
- experiments / verification of setting incremental encoder via command 1490\
tue jul 20
- 4:45 hrs
- phone w/ED re dataport sel
- email re dataport w/SWIFI
- phone w/RC discuss SWIFI communication, pyramid
- analysis of AAS resolution, email on same
- discuss w/RC pyramid and torque control
wed jul 21
- 9:45a-