Hours 1004

From DIDEAS Wiki
Revision as of 19:40, 20 April 2010 by Ceb (talk | contribs)
Jump to: navigation, search

APR 2010

Tue apr 6th

  • 2.5 hrs
    • debug S3, S5 ankles.
    • MC firmware was incompatible with trunk.
    • S3 appears to be broken, no green LED on FET board.


Wed Apr 7th

    • emails w/MPD re miss-build of charger LDO
  • 4pm-7:20p
    • discuss python wrapper w/ED
    • investiage failure S3
    • prepare S3/S5 for demo
    • set up calb table for S5

thur apr 8th

  • 35 mins phone w/GG - discuss status of S5
  • 3:15-5:45 (2.5 hr)
    • move LTF2 and test the use of 2 half duplex serial ports to MC
  • 45 mins
    • debug SWIFI for S5 - is using old firmware
    • update Wip4c firmware to use SVN revision,
    • update TWIKI


sun apr 18

  • 2.5 hrs RMB-XLP sensor design / layout

mon apr 19

  • 50 min discuss status w/RC and HH

tue apr 20

  • 30 mis discuss with ED LTF python wrapper, details of V2 calibration, router changes, PCs
  • 30 mins email / research w/CA re RLS magnet.