Difference between revisions of "Hours 1004"

From DIDEAS Wiki
Jump to: navigation, search
m
m
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
=APR 2010=
 
=APR 2010=
 +
==thu apr 1==
 +
* 5 min w/RC
 +
* 30 min w/ED, discuss issues with charge amp
 +
 +
 +
==fri apr 2==
 +
*15 : discuss data collection w/ED
 +
*30 min : discuss LTF grouding and LDWASH with CA
 +
 +
==sat apr 3==
 +
???
  
 
==Tue apr 6th==
 
==Tue apr 6th==
 
*2.5 hrs
 
*2.5 hrs
 
** debug S3, S5 ankles.
 
** debug S3, S5 ankles.
** MC firmware was incompatable with trunk.
+
** MC firmware was incompatible with trunk.
 
** S3 appears to be broken, no green LED on FET board.
 
** S3 appears to be broken, no green LED on FET board.
  
Line 17: Line 28:
 
**prepare S3/S5 for demo
 
**prepare S3/S5 for demo
 
**set up calb table for S5
 
**set up calb table for S5
 +
 +
==thur apr 8th==
 +
*35 mins phone w/GG - discuss status of S5
 +
*3:15-5:45  (2.5 hr)
 +
**move LTF2 and test the use of 2 half duplex serial ports to MC
 +
*45 mins
 +
**debug SWIFI for S5 - is using old firmware
 +
**update Wip4c firmware to use SVN revision,
 +
**update TWIKI
 +
 +
 +
 +
==sun apr 18==
 +
*2.5 hrs RMB-XLP sensor design / layout
 +
 +
==mon apr 19==
 +
*50 min discuss status w/RC and HH
 +
 +
==tue apr 20==
 +
*30 mis discuss with ED LTF python wrapper, details of V2 calibration, router changes, PCs
 +
*30 mins email / research w/CA re RLS magnet.
 +
*1.5 hrs - experiments with RLS (and email RC) to check for quantization
 +
 +
==mon apr 26==
 +
*30 mins discuss w/ED IP address conflict of SWIFI, other network updates,
 +
 +
==tue apr 27==
 +
*11 hrs - assist in the commission of H^2.  Assist with the diagnosis of problem with IP:193, only intermitantly powers.  also HS torque is very small where as 215 has large HS torque.
 +
 +
==wed apr 28==
 +
 +
==thur apr 29==
 +
6pm - 11:30p
 +
- work on renishaw, dinner w/rick

Latest revision as of 14:17, 6 May 2010

APR 2010

thu apr 1

  • 5 min w/RC
  • 30 min w/ED, discuss issues with charge amp


fri apr 2

  • 15 : discuss data collection w/ED
  • 30 min : discuss LTF grouding and LDWASH with CA

sat apr 3

???

Tue apr 6th

  • 2.5 hrs
    • debug S3, S5 ankles.
    • MC firmware was incompatible with trunk.
    • S3 appears to be broken, no green LED on FET board.


Wed Apr 7th

    • emails w/MPD re miss-build of charger LDO
  • 4pm-7:20p
    • discuss python wrapper w/ED
    • investiage failure S3
    • prepare S3/S5 for demo
    • set up calb table for S5

thur apr 8th

  • 35 mins phone w/GG - discuss status of S5
  • 3:15-5:45 (2.5 hr)
    • move LTF2 and test the use of 2 half duplex serial ports to MC
  • 45 mins
    • debug SWIFI for S5 - is using old firmware
    • update Wip4c firmware to use SVN revision,
    • update TWIKI


sun apr 18

  • 2.5 hrs RMB-XLP sensor design / layout

mon apr 19

  • 50 min discuss status w/RC and HH

tue apr 20

  • 30 mis discuss with ED LTF python wrapper, details of V2 calibration, router changes, PCs
  • 30 mins email / research w/CA re RLS magnet.
  • 1.5 hrs - experiments with RLS (and email RC) to check for quantization

mon apr 26

  • 30 mins discuss w/ED IP address conflict of SWIFI, other network updates,

tue apr 27

  • 11 hrs - assist in the commission of H^2. Assist with the diagnosis of problem with IP:193, only intermitantly powers. also HS torque is very small where as 215 has large HS torque.

wed apr 28

thur apr 29

6pm - 11:30p - work on renishaw, dinner w/rick