Difference between revisions of "Hours 1004"
From DIDEAS Wiki
m |
m |
||
Line 22: | Line 22: | ||
*3:15-5:45 (2.5 hr) | *3:15-5:45 (2.5 hr) | ||
**move LTF2 and test the use of 2 half duplex serial ports to MC | **move LTF2 and test the use of 2 half duplex serial ports to MC | ||
+ | *45 mins | ||
+ | **debug SWIFI for S5 - is using old firmware | ||
+ | **update Wip4c firmware to use SVN revision, | ||
+ | **update TWIKI |
Revision as of 01:36, 9 April 2010
APR 2010
Tue apr 6th
- 2.5 hrs
- debug S3, S5 ankles.
- MC firmware was incompatable with trunk.
- S3 appears to be broken, no green LED on FET board.
Wed Apr 7th
- emails w/MPD re miss-build of charger LDO
- 4pm-7:20p
- discuss python wrapper w/ED
- investiage failure S3
- prepare S3/S5 for demo
- set up calb table for S5
thur apr 8th
- 35 mins phone w/GG - discuss status of S5
- 3:15-5:45 (2.5 hr)
- move LTF2 and test the use of 2 half duplex serial ports to MC
- 45 mins
- debug SWIFI for S5 - is using old firmware
- update Wip4c firmware to use SVN revision,
- update TWIKI