Hours 1003

From DIDEAS Wiki
Revision as of 23:42, 1 March 2010 by Ceb (talk | contribs)
Jump to: navigation, search

todo

  • discuss w/RC requirements for lab robots.
  • update SWIFI firmware on S4.
  • email calb data to RIC
  • fabricate more SWIFI PCBs
  • IMU ECOs.

MAR 2010

mon mar 1

  • 30 mins emails re firmware and config w/GG, multiple LTF plan w/GG
  • 3:45pm -
  • discuss w/DG LTF2, and moving to back.
  • work w/CA to get LTF2 back on network
  • discuss new network architecture for swifis (lab net) and BSt. w/ED
  • email w/GG re building