Difference between revisions of "Hours 1003"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 31: Line 31:
 
8pm-9:40pm
 
8pm-9:40pm
 
*investigate LTF network issue
 
*investigate LTF network issue
* setup VPN
+
* setup VPN at Binney
 +
 
 +
==wed mar 3==
 +
*11a - 6:10p
 +
**work with LTF1 and DG to determine cause of excessive temperature rise
 +
**cause traced to apparent encoder drift.
 +
 
 +
==thur mar 4==
 +
*

Revision as of 14:43, 4 March 2010

todo

  • discuss w/RC requirements for lab robots.
  • update SWIFI firmware on S4.
  • email calb data to RIC
  • fabricate more SWIFI PCBs
  • IMU ECOs.

MAR 2010

mon mar 1

  • 30 mins emails re firmware and config w/GG, multiple LTF plan w/GG
  • admin for severl hrs.
  • 3:45pm - 6:45p
  • discuss w/DG LTF2, and moving to back.
  • work w/CA to get LTF2 back on network
  • discuss new network architecture for swifis (lab net) and BSt. w/ED
  • email w/GG re building

  • 1.5 hrs.
  • drive to microcenter.
  • experment with new accesspoint
  • setup dd-wrt

tue mar 2

2:30pm - 6:50p

  • continue access point config
  • setup PC at bineny
  • setup LTF, get views working
  • discuss network and AP w/ED

8pm-9:40pm

  • investigate LTF network issue
  • setup VPN at Binney

wed mar 3

  • 11a - 6:10p
    • work with LTF1 and DG to determine cause of excessive temperature rise
    • cause traced to apparent encoder drift.

thur mar 4