Difference between revisions of "Hours 1003"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 17: Line 17:
 
*discuss new network architecture for swifis (lab net) and BSt. w/ED
 
*discuss new network architecture for swifis (lab net) and BSt. w/ED
 
*email w/GG re building
 
*email w/GG re building
 +
-------
 +
*1.5 hrs.
 +
*drive to microcenter.
 +
*experment with new accesspoint
 +
*setup dd-wrt
 +
 +
==tue mar 2==
 +
2:30pm - 6:50p
 +
*continue access point config
 +
*setup PC at bineny
 +
*setup LTF, get views working
 +
8pm-9:40pm
 +
*investigate LTF network issue
 +
* setup VPN

Revision as of 02:40, 3 March 2010

todo

  • discuss w/RC requirements for lab robots.
  • update SWIFI firmware on S4.
  • email calb data to RIC
  • fabricate more SWIFI PCBs
  • IMU ECOs.

MAR 2010

mon mar 1

  • 30 mins emails re firmware and config w/GG, multiple LTF plan w/GG
  • 3:45pm -
  • discuss w/DG LTF2, and moving to back.
  • work w/CA to get LTF2 back on network
  • discuss new network architecture for swifis (lab net) and BSt. w/ED
  • email w/GG re building

  • 1.5 hrs.
  • drive to microcenter.
  • experment with new accesspoint
  • setup dd-wrt

tue mar 2

2:30pm - 6:50p

  • continue access point config
  • setup PC at bineny
  • setup LTF, get views working

8pm-9:40pm

  • investigate LTF network issue
  • setup VPN