Difference between revisions of "Hours 1003"
From DIDEAS Wiki
m |
m |
||
Line 2: | Line 2: | ||
=todo= | =todo= | ||
− | *discuss w/ | + | *discuss w/RC requirements for lab robots. |
*update SWIFI firmware on S4. | *update SWIFI firmware on S4. | ||
*email calb data to RIC | *email calb data to RIC | ||
+ | *fabricate more SWIFI PCBs | ||
+ | *IMU ECOs. | ||
=MAR 2010= | =MAR 2010= | ||
==mon mar 1== | ==mon mar 1== | ||
*30 mins emails re firmware and config w/GG, multiple LTF plan w/GG | *30 mins emails re firmware and config w/GG, multiple LTF plan w/GG | ||
+ | |||
+ | *3:45pm - | ||
+ | *discuss w/DG LTF2, and moving to back. | ||
+ | *work w/CA to get LTF2 back on network | ||
+ | *discuss new network architecture for swifis (lab net) and BSt. w/ED | ||
+ | *email w/GG re building |
Revision as of 23:42, 1 March 2010
todo
- discuss w/RC requirements for lab robots.
- update SWIFI firmware on S4.
- email calb data to RIC
- fabricate more SWIFI PCBs
- IMU ECOs.
MAR 2010
mon mar 1
- 30 mins emails re firmware and config w/GG, multiple LTF plan w/GG
- 3:45pm -
- discuss w/DG LTF2, and moving to back.
- work w/CA to get LTF2 back on network
- discuss new network architecture for swifis (lab net) and BSt. w/ED
- email w/GG re building