Hours 1001

From DIDEAS Wiki
Revision as of 16:04, 15 January 2010 by Ceb (talk | contribs) (thur jan 14)
Jump to: navigation, search

Jan 2010

todo

Mon Jan 4

  • 9:30a - 3:10p -30
    • prepare PSER1eb and PSER2hb
    • layout inverter oscillator and complete two eddy current sensors PCBs
    • panel and submit PCBs for fabrication
  • 4pm - 7:30p -45
    • discuss w/DG LTF status
    • resubmit PCBs after project rejected.
    • biquad filter research and implementation
    • discuss w/RC LTF status (41 hz) and V2 status

todo

  • LTF data analysis
  • get V2 going

tue jan 5

  • 10:30a-3pm -1:40
    • biquad filter tested on linux, added support commands under tkcmdset
    • converted LTF data from Dec30
  • 3:30p - 9:40pm
    • work with GG and CA on IMU programing, hardware diagnosis
    • review LTF data with DG, experiment with LTF

wed jan 6

  • 8am - 11:40a +60min
    • review robo_config for ability to load/save tables
    • develop test procedure for ED / GG to load / save EEPROM tables on Spld.
    • discuss w/DG how to proceed w/LTF experiments and XP software requirements.
    • complete integration of biquad.c into MC firmware, add prototypes to result in cleaner MC compile
    • located tool to design biquad filter coeffs, designed 200 & 300 hz Bstop filters.
  • 3pm - 11:25pm -30 +30
    • run LTF w/DG
    • tested biquad filter
    • update LTF SC/MC
    • ran sine sweeps and white noise.
    • converted data emailed to DG

thur jan 7

  • 15+20+20+1hr
    • discuses w/RC robot problem and patent
    • phone w/DG re LTF results
    • phone w/GG re LTF an robot results
    • read patent proposal

fri jan 8

  • 1 hr
    • working with DG on LTF

sat jan 9

sun jan 10

  • 2pm - 8:45p -30
    • meet w/RC @CKF - discuss robot testing, holster, block diag, belt detector
    • review SERDES
    • discuss SERDES ideas w/MM - decide on FPGA w/1 TX, RX, CLK
    • review of patent
    • consider alternatives to connecting to SC/MC. Possibly HS USB?

mon jan11

  • 4-9pm
    • discuss robot arm control w/ZH and GG w/python
    • discuss w/GG java UDP for plot_lifefix
    • work w/DG on LTF. Run white noise tess, followed by a large series of sine sweeps.

tue jan 12

  • 1.5 hrs - reading patent
  • 3-8:30p
    • sign patent papers
    • review matlab UDP java tool
    • wire up new LTF power supply.
    • work with DG on LTF freq response, and biquad filter.

wed jan 13

  • 1 hr
    • investigate methods of multiplexing ISP for debug deep in the robot.
    • 3 methods:
      • develop our own programmer that MPLAB can use (or copy one)
      • implment the ISP statemachine in the FPGA so it can determiante directionalty
      • use an analog swtich to multiple the PGD signal - so we don't have to understand the protocol, use SER-DES for the remaining signals.
  • 4pm-5:30p
    • cut pcb pannel
    • assemble eddy current sensor PCB and test.
    • ???
  • 6:15pm - 10:15pm
    • work with DG on LTF.
      • verify freq rsp of pole zeros with fvtool
      • calculate new pole zeros
      • test biquad on LTF
      • start run_lifefix_v2, issues with KCA.

thur jan 14

  • 2:35 - 10:20p
    • digikey order for RJ45 magnetics and other items
    • assist ZH with real-time work loop plotting
    • bring up LTF, try to understand commutation problem
    • LTF PID tuning
    • LTF work loop studies.

fri jan 15

  • complete excell entry for Dec and to present time for Jan