Difference between revisions of "Hours 1001"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 30: Line 30:
  
 
= wed jan 6=
 
= wed jan 6=
* 8am - 11:40a
+
* 8am - 11:40a +60min
 
** review robo_config for ability to load/save tables
 
** review robo_config for ability to load/save tables
** develope test procedure for ED / GG to load / save EEPROM tables on Spld.
+
** develop test procedure for ED / GG to load / save EEPROM tables on Spld.
 
** discuss w/DG how to proceed w/LTF  experiments and XP software requirements.
 
** discuss w/DG how to proceed w/LTF  experiments and XP software requirements.
 
** complete integration of biquad.c into MC firmware, add prototypes to result in cleaner MC compile
 
** complete integration of biquad.c into MC firmware, add prototypes to result in cleaner MC compile
 
** located tool to design biquad filter coeffs, designed 200 & 300 hz Bstop filters.
 
** located tool to design biquad filter coeffs, designed 200 & 300 hz Bstop filters.
 +
*3pm - 11:25pm -30
 +
**run LTF w/DG
 +
**tested biquad filter
 +
**update LTF SC/MC
 +
**ran sine sweeps and white noise.

Revision as of 04:27, 7 January 2010

Jan 2010

todo

Mon Jan 4

  • 9:30a - 3:10p -30
    • prepare PSER1eb and PSER2hb
    • layout inverter oscillator and complete two eddy current sensors PCBs
    • panel and submit PCBs for fabrication
  • 4pm - 7:30p -45
    • discuss w/DG LTF status
    • resubmit PCBs after project rejected.
    • biquad filter research and implementation
    • discuss w/RC LTF status (41 hz) and V2 status

todo

  • LTF data analysis
  • get V2 going

tue jan 5

  • 10:30a-3pm -1:40
    • biquad filter tested on linux, added support commands under tkcmdset
    • converted LTF data from Dec30
  • 3:30p - 9:40pm
    • work with GG and CA on IMU programing, hardware diagnosis
    • review LTF data with DG, experiment with LTF

wed jan 6

  • 8am - 11:40a +60min
    • review robo_config for ability to load/save tables
    • develop test procedure for ED / GG to load / save EEPROM tables on Spld.
    • discuss w/DG how to proceed w/LTF experiments and XP software requirements.
    • complete integration of biquad.c into MC firmware, add prototypes to result in cleaner MC compile
    • located tool to design biquad filter coeffs, designed 200 & 300 hz Bstop filters.
  • 3pm - 11:25pm -30
    • run LTF w/DG
    • tested biquad filter
    • update LTF SC/MC
    • ran sine sweeps and white noise.