Hours 0910

From DIDEAS Wiki
Revision as of 17:14, 2 October 2009 by Ceb (talk | contribs)
Jump to: navigation, search

Oct 09

Fri Oct 2

  • 11:30a - 1:15p
    • review AVR report from PCB fab house. Errors need to be correct and resubmitted.

Thur Oct 1

  • 9-10:30
    • improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
  • 4-8:15
    • improve manual routing of WIP4C1, manual route of VCC33, re run auto route
    • create a dclamp2 -
    • submit project to fab house for DRC analysis
  • 9:30p - 2:15 a
    • review time drif experiment and improve output and start plotting
    • test LF, checking output data, build new envelope for 2000N
    • setup testjig to monitor copley (required reboot and serial cable was moved)
    • running lifefix w/trajectory enevelope testing and SWIFI logging to linux box.


notes