Difference between revisions of "Hours 0910"

From DIDEAS Wiki
Jump to: navigation, search
m
Line 17: Line 17:
 
==sat oct 17==
 
==sat oct 17==
 
* 50 mins : documenting / coding new statemachine  
 
* 50 mins : documenting / coding new statemachine  
 +
===notes===
 +
* Pomona Electrionics - Model 6341 - very nice voltage probes.
 
==fri oct 16==
 
==fri oct 16==
 
* 1?? hr : flushing out details for new statemachine.  (improvements to SW / ES w/goal of estimating speed)
 
* 1?? hr : flushing out details for new statemachine.  (improvements to SW / ES w/goal of estimating speed)

Revision as of 19:49, 17 October 2009

Oct 2009

todo

  • PCB info for SWIFI
  • LF - needs to confirm that MPD comm is working - eg esp w/SWIFI
  • function generator for Sat
  • get LF potential function
  • for LF, if ABS - INC encoder error, then don't drop into mode 0!
  • add "text code" the ASC output from SWIFI


  • create SP demo software version for testing 4pm Mon
  • review schematics for MPD
  • review LF data logs, fix envelope errors (there is an exception, find cause, fix.)

sat oct 17

  • 50 mins : documenting / coding new statemachine

notes

  • Pomona Electrionics - Model 6341 - very nice voltage probes.

fri oct 16

  • 1?? hr : flushing out details for new statemachine. (improvements to SW / ES w/goal of estimating speed)
    • developing W statemachine ideas that will allow for softer K3 at speed - and to enter LS after FF
  • 45 mins : create SWIFI assembly documentation, explain assembly with CA
    • create assembly docs for Wip4c


thu oct 15

  • 1:10-2:30
    • email re LF crash, working w/CA, ED, and DG on various LF issues, getting it going, etc.
  • 3:50p - 1:30a
    • power computations for DG re TB hall trial. 42s, 56.5J to MOT, 19.6J=IIR, 7.3=BAT ESR
    • w/ED review FTDI driver source to see about faster baud rates
    • test high baud rates w/do_command. seems to support upto 3Mbaud w/DC - however dataport has many many errors, and appears to be dropping data even with a simple high speed reader.
    • very confused by datarate of MC. 49 bytes in 600uS, 8 bits in 9.9uS! - but should be 1Mbaud.
    • both the SWIFI and the MC/SC all have messed up high speed baudrates.
    • cu = 0.0039; temperature = (res - r0)/(r0 * cu);
    • sent plot to RC from the OCt13 walk
    • created tags entry for the OCt13 "SPLT3" tuning.
    • documentation for Pser2h and ldwash2

wed oct 14

  • 1:20pm - 7:50p
    • work with GA on IMU diagnoses, he finds cold solder join
    • discuss data set and review walk w/ZH
    • discuss documentation w/DG and DS
    • discuss power consumption with Dk
    • discuss PFF w/DG, then review LF source of oscillation. Adding compliance should reduce the problem
    • modifiy LF to stop on ESC, modify LF to not halt on matlab requirement. (untested)

tue oct 13

  • 11:20- 12:20
    • locate computer for chris
    • write T style log class for lifefix.
  • arrive 1:05p - 11:30pm
    • tuning for TB
    • move lifefix
    • place digikey order for 2nd lifefix components.

notes

mon oct 12

  • 2:10p - 12:30a
    • matlab running w/IMU dataset, added cmd line option to wifi_fast to select .vlist file
    • verified PP side of FF, cmd 1445 w/1 to enable, cmd 1444 reads back; present values in MC are far too aggressive for PP
    • unable to get load/save defaults to work from keyboard UI, cmd 146,147 work.
    • need (2) SC-SWIFI cables, no spares find one, diagnose that has PWR-GND reverse on 6pin SWIFI side.
    • MC (S02)not able to complete commutation
    • tuning on Hugh, explain operation to DG
    • improvements to EEPROM init table
    • built calb tables from ZH email
    • loaded calb tables into S1
    • sg_tor_const needs to be set by calb table
    • stop by lab, get PCBs, and trim.
  • 1:50a-3:05a
    • cut PCBs, respond emails
    • review MPD R200, make notes, RC wants Red PCBs


sun oct 11

  • 3pm - 7pm
    • prepare for, and restore after for power down
    • working on LF, and run out of office by bld manager. sort tools in the interim
    • get lifefix operational
  • 9:30- 2:20a
    • review w/EP how to improve graphic output speed for LF
    • rewire S2 for development.
    • MC code conditionally compiles
    • robo_config now returns error notices about invalid tables from AK

sat oct 10

  • 2 hrs
    • attempting access to LF and pedant. Emails to eric
    • status and task list for tech.
  • 2:55-9pm
    • discuss status w/RC
    • repair Windows box config - fix dual monitor - disable desktop search
    • assess status of SP robots, neither is configured correctly.
    • working on lifefix users manual : Lifefix_users
    • start up lifefix

fri oct 9

  • 12:15 - 1:20pm
    • review LF data, compose possible hypothis to cause of problem
    • develope parts lists/BOM for orders
  • 5-9:05 -20
    • try to recover LF datafiles from linux box - not able to get samba or SSH access
    • develope parts lists/BOM for orders
    • place digikey order
    • contact PCB fab re shipping to new location

notes

[ROOT SSH]

thr oct 8

  • 2:00p - 11:30
    • help ED to run LF, UDP term needs to be running
    • work out how UPS will interface to system. power off: 7pm-11pm Fri, 5pm-?? Sun
    • investigating tracking problems with LF.
    • getting LF running, create several new envelopes
    • make improvements (fix bugs) to run_lifefix.


wed oct 7

  • 12:40-2:05
    • develop parts list for latest PCB fab project
  • 6:15 - 8:40
    • explain to DG, test, correct backup ankle firmware. SWIFI has problem sending garbage
    • test PDA, find working BT. Need to locate 2 others.
    • charge batteries
  • 11:05 - 2:45
    • test WOW ankles, replace bullet connector (test others), verify PDA operation
    • run LF, find problems with envelop.

notes

  • WIP4C - change 8x3.55 cap to 220uF
  • review PN for bussed resistors
  • find a sub for the value 5.87k (5.90k?)
  • find value for QY1
  • change 22uh to 22u

tue oct 6

  • install, experiment with eispice for simulation
  • 2:40p - 11:30 -25
    • discuss project status w/ZH
    • meet w/DG - explain VS and KS loops, LF, we study backlash and photo disassembly
    • set up LF photos on webserver, setup software files for GG
    • investigate SG problem on TJ
    • review SG layout


mon oct 5

  • 30 mins - developing switching power simulation
  • 3:15- 5:45, -15
    • review IW0905 DRC errors, correct and submit
    • PCB submission accepted from SPE
    • ordered storage bins
  • 6:15pm - 10:45, -45 mins
    • review time drift experiment, improve translation of log file to matlab.
    • meet w/RC re new hires, plans for each, etc
    • review MPD hardware design changes, email MR


sun oct 4

  • 30 mins - developing switching power simulation
  • 4:30pm- 7:20pm


sat oct 3

  • 1pm - 2:45
    • analysis of LF log file (update program for new log format, correct errors.)
  • 3:55 -
    • LF stopped after 11014 passes - review physical status of LF, appears okay.
    • the most direct observation of the cause of stop is that cycle timer counter stopped after 500 tics. Could be that SWIFI data wasn't received yet, or that the timer actually stopped!
    • belt is slipping and which causes the zero to drift - which causes the encoder trigger point to be missed.

Fri Oct 2

  • 11:30a - 1:15p
    • review AVR report from PCB fab house. Errors need to be correct and resubmitted.
  • 5:00p - 7:00 p
    • correct DRC mistakes, resubmit.
  • LF stopped after 314278 passes (22:14pm)
  • 1am - 2am??
    • review LF stopped data, and restart

Thur Oct 1

  • 9-10:30
    • improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
  • 4-8:15
    • improve manual routing of WIP4C1, manual route of VCC33, re run auto route
    • create a dclamp2 -
    • submit project to fab house for DRC analysis
  • 9:30p - 2:15 a
    • review time drif experiment and improve output and start plotting
    • test LF, checking output data, build new envelope for 2000N
    • setup testjig to monitor copley (required reboot and serial cable was moved)
    • running lifefix w/trajectory enevelope testing and SWIFI logging to linux box.


notes