Difference between revisions of "Hours 0910"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 1: Line 1:
 
{{ceb_private}}
 
{{ceb_private}}
 
=Oct 09=
 
=Oct 09=
 +
==Fri Oct 2==
 +
* 11:30a - 1:15p
 +
** review AVR report from PCB fab house.  Errors need to be correct and resubmitted.
 +
 
==Thur Oct 1==
 
==Thur Oct 1==
 
* 9-10:30
 
* 9-10:30

Revision as of 17:14, 2 October 2009

Oct 09

Fri Oct 2

  • 11:30a - 1:15p
    • review AVR report from PCB fab house. Errors need to be correct and resubmitted.

Thur Oct 1

  • 9-10:30
    • improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
  • 4-8:15
    • improve manual routing of WIP4C1, manual route of VCC33, re run auto route
    • create a dclamp2 -
    • submit project to fab house for DRC analysis
  • 9:30p - 2:15 a
    • review time drif experiment and improve output and start plotting
    • test LF, checking output data, build new envelope for 2000N
    • setup testjig to monitor copley (required reboot and serial cable was moved)
    • running lifefix w/trajectory enevelope testing and SWIFI logging to linux box.


notes