Difference between revisions of "Hours 0910"
From DIDEAS Wiki
m |
m |
||
Line 8: | Line 8: | ||
** create a dclamp2 - | ** create a dclamp2 - | ||
** submit project to fab house for DRC analysis | ** submit project to fab house for DRC analysis | ||
− | * 9:30p - | + | * 9:30p - 2:15 a |
− | ** review time | + | ** review time drif experiment and improve output and start plotting |
** test LF, checking output data, build new envelope for 2000N | ** test LF, checking output data, build new envelope for 2000N | ||
+ | ** setup testjig to monitor copley (required reboot and serial cable was moved) | ||
+ | ** running lifefix w/trajectory enevelope testing and SWIFI logging to linux box. | ||
+ | |||
==notes== | ==notes== | ||
*[http://cds.linear.com/docs/Application%20Note/an72f.pdf Linear 7ns Comparator AN] | *[http://cds.linear.com/docs/Application%20Note/an72f.pdf Linear 7ns Comparator AN] | ||
*[http://www.linear.com/pc/downloadDocument.do?navId=H0,C1,C1154,C1004,C1012,P1294,D4017 LT1116 7ns] | *[http://www.linear.com/pc/downloadDocument.do?navId=H0,C1,C1154,C1004,C1012,P1294,D4017 LT1116 7ns] |
Revision as of 06:15, 2 October 2009
Oct 09
Thur Oct 1
- 9-10:30
- improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
- 4-8:15
- improve manual routing of WIP4C1, manual route of VCC33, re run auto route
- create a dclamp2 -
- submit project to fab house for DRC analysis
- 9:30p - 2:15 a
- review time drif experiment and improve output and start plotting
- test LF, checking output data, build new envelope for 2000N
- setup testjig to monitor copley (required reboot and serial cable was moved)
- running lifefix w/trajectory enevelope testing and SWIFI logging to linux box.