Difference between revisions of "Hours 0910"

From DIDEAS Wiki
Jump to: navigation, search
m
m
Line 4: Line 4:
 
* 9-10:30
 
* 9-10:30
 
** improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
 
** improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
* 4-
+
* 4-8:15
 
** improve manual routing of WIP4C1, manual route of VCC33, re run auto route
 
** improve manual routing of WIP4C1, manual route of VCC33, re run auto route
 +
** create a dclamp2 -
 +
** submit project to fab house for DRC analysis
 +
* 9:30p -
 +
** review time driff experment and improve output and start plotting
 +
** test LF, checking output data, build new envelope for 2000N
 +
 
==notes==
 
==notes==
 
*[http://cds.linear.com/docs/Application%20Note/an72f.pdf Linear 7ns Comparator AN]
 
*[http://cds.linear.com/docs/Application%20Note/an72f.pdf Linear 7ns Comparator AN]
 
*[http://www.linear.com/pc/downloadDocument.do?navId=H0,C1,C1154,C1004,C1012,P1294,D4017 LT1116 7ns]
 
*[http://www.linear.com/pc/downloadDocument.do?navId=H0,C1,C1154,C1004,C1012,P1294,D4017 LT1116 7ns]

Revision as of 03:32, 2 October 2009

Oct 09

Thur Oct 1

  • 9-10:30
    • improve gnd grid, add plane for switcher, and correct poor routing issues w/WIP4C1.
  • 4-8:15
    • improve manual routing of WIP4C1, manual route of VCC33, re run auto route
    • create a dclamp2 -
    • submit project to fab house for DRC analysis
  • 9:30p -
    • review time driff experment and improve output and start plotting
    • test LF, checking output data, build new envelope for 2000N

notes