SC/MC testing

  • apply power with FUP power cable to MC FUP.
  • connect wired (or BT) to SC FUP


FET testing

  • connect FET to known good SC/MC with flex cable.



pyramid verification

  • connect P to working SC



assembly

  • run motor tests over night, installed in side plates
  • actuator - measure / adjust belt tension - record value and date it.
  • run BT communications wire

before K3

  • insert both programming cables
  • wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
  • red lock tight pyramid tube adapter into WOW pack
  • connect BT mod to flexF midpoint, make sure to correct module for left vs right.