Difference between revisions of "AIW assembly"

From DIDEAS Wiki
Jump to: navigation, search
m
m (Power connectors)
Line 1: Line 1:
 
=Power connectors=
 
=Power connectors=
 
<strong>TEST ALL MALE BULLET CONNECTORS</strong>  See example of how this device fails.
 
<strong>TEST ALL MALE BULLET CONNECTORS</strong>  See example of how this device fails.
* Use 3.5mm male bullet connectors on the motor.   
+
* Use 3.5mm male bullet connectors on the 3 wires from the EC30 motor.   
* Use 3.5mm male bullet connectors on the output of the WOW battery pack
+
* Use 3.5mm male bullet connectors on the 2 power wires of the power board.
* Use 3.5mm female connectors on the power board
+
* Use 3.5mm female bullet connectors on the connector WOW battery pack (2)
 
 
  
 
=SC/MC testing=
 
=SC/MC testing=

Revision as of 08:03, 12 January 2009

Power connectors

TEST ALL MALE BULLET CONNECTORS See example of how this device fails.

  • Use 3.5mm male bullet connectors on the 3 wires from the EC30 motor.
  • Use 3.5mm male bullet connectors on the 2 power wires of the power board.
  • Use 3.5mm female bullet connectors on the connector WOW battery pack (2)

SC/MC testing

  • apply power with FUP power cable to MC FUP.
  • connect wired (or BT) to SC FUP


FET testing

  • connect FET to known good SC/MC with flex cable.



pyramid verification

  • connect P to working SC

run over night test

  • stress test a board set mounted in side plates
  • using mode 7, measure the current offsets and record. copy values into statemachine.h


assembly

  • run motor tests over night, installed in side plates
  • actuator - measure / adjust belt tension - record value and date it.
  • run BT communications wire

before K3

  • insert both programming cables
  • wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
  • red lock tight pyramid tube adapter into WOW pack
  • connect BT mod to flexF midpoint, make sure to correct module for left vs right.