Difference between revisions of "AIW assembly"
From DIDEAS Wiki
m |
m |
||
Line 1: | Line 1: | ||
− | |||
=SC/MC testing= | =SC/MC testing= | ||
* apply power with FUP power cable to MC FUP. | * apply power with FUP power cable to MC FUP. | ||
Line 24: | Line 23: | ||
*run BT communications wire | *run BT communications wire | ||
+ | ==before K3== | ||
+ | *insert both programming cables | ||
*wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise) | *wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise) | ||
*red lock tight pyramid tube adapter into WOW pack | *red lock tight pyramid tube adapter into WOW pack | ||
* connect BT mod to flexF midpoint, make sure to correct module for left vs right. | * connect BT mod to flexF midpoint, make sure to correct module for left vs right. |
Revision as of 05:05, 10 December 2008
SC/MC testing
- apply power with FUP power cable to MC FUP.
- connect wired (or BT) to SC FUP
FET testing
- connect FET to known good SC/MC with flex cable.
pyramid verification
- connect P to working SC
assembly
- run motor tests over night, installed in side plates
- actuator - measure / adjust belt tension - record value and date it.
- run BT communications wire
before K3
- insert both programming cables
- wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
- red lock tight pyramid tube adapter into WOW pack
- connect BT mod to flexF midpoint, make sure to correct module for left vs right.