=SC/MC testing=
 
=SC/MC testing=
 
* apply power with FUP power cable to MC FUP.
 
* apply power with FUP power cable to MC FUP.
Line 24: Line 23:
 
*run BT communications wire
 
*run BT communications wire
  
 +
==before K3==
 +
*insert both programming cables
 
*wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
 
*wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
 
*red lock tight pyramid tube adapter into WOW pack
 
*red lock tight pyramid tube adapter into WOW pack
  
 
* connect BT mod to flexF midpoint, make sure to correct module for left vs right.
 
* connect BT mod to flexF midpoint, make sure to correct module for left vs right.

Revision as of 05:05, 10 December 2008

SC/MC testing

  • apply power with FUP power cable to MC FUP.
  • connect wired (or BT) to SC FUP


FET testing

  • connect FET to known good SC/MC with flex cable.



pyramid verification

  • connect P to working SC



assembly

  • run motor tests over night, installed in side plates
  • actuator - measure / adjust belt tension - record value and date it.
  • run BT communications wire

before K3

  • insert both programming cables
  • wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
  • red lock tight pyramid tube adapter into WOW pack
  • connect BT mod to flexF midpoint, make sure to correct module for left vs right.