=Power connectors= | =Power connectors= | ||
<strong>TEST ALL MALE BULLET CONNECTORS</strong> See example of how this device fails. | <strong>TEST ALL MALE BULLET CONNECTORS</strong> See example of how this device fails. | ||
− | * Use 3.5mm male bullet connectors on the motor. | + | * Use 3.5mm male bullet connectors on the 3 wires from the EC30 motor. |
− | * Use 3.5mm male bullet connectors on the | + | * Use 3.5mm male bullet connectors on the 2 power wires of the power board. |
− | * Use 3.5mm female connectors on the | + | * Use 3.5mm female bullet connectors on the connector WOW battery pack (2) |
− | |||
=SC/MC testing= | =SC/MC testing= |
Revision as of 08:03, 12 January 2009
Contents
Power connectors
TEST ALL MALE BULLET CONNECTORS See example of how this device fails.
- Use 3.5mm male bullet connectors on the 3 wires from the EC30 motor.
- Use 3.5mm male bullet connectors on the 2 power wires of the power board.
- Use 3.5mm female bullet connectors on the connector WOW battery pack (2)
SC/MC testing
- apply power with FUP power cable to MC FUP.
- connect wired (or BT) to SC FUP
FET testing
- connect FET to known good SC/MC with flex cable.
pyramid verification
- connect P to working SC
run over night test
- stress test a board set mounted in side plates
- using mode 7, measure the current offsets and record. copy values into statemachine.h
assembly
- run motor tests over night, installed in side plates
- actuator - measure / adjust belt tension - record value and date it.
- run BT communications wire
before K3
- insert both programming cables
- wait to install K3 last, VHB copper spreader to K3 (might fall out otherwise)
- red lock tight pyramid tube adapter into WOW pack
- connect BT mod to flexF midpoint, make sure to correct module for left vs right.