Difference between revisions of "Hours 1005"
From DIDEAS Wiki
m |
m |
||
Line 27: | Line 27: | ||
==thur may 6== | ==thur may 6== | ||
*8:45a - | *8:45a - | ||
+ | *10 hrs | ||
+ | **RMB replacement design. | ||
+ | **on w/CA on details of how to have wire leave the PCA | ||
+ | |||
+ | ==fri may 7== | ||
+ | *12 hrs | ||
+ | **discuss no-component areas of PCB w/CA and CW. | ||
+ | **re-layout | ||
+ | **finalize RMB desin that uses 16 bits bi-polar differential ADCs | ||
+ | **finalize the RMB replacement. submit PCBs for fab. need to submit silk screens | ||
+ | |||
+ | ==sat may 8== |
Revision as of 19:50, 8 May 2010
Contents
MAY 2010
sat may 1
3.5 hrs - renishaw development - develope IC code
sun may 2
- 2 hrs, how to connect SSI to P32
- 8pm - 10:45p
- develope renishaw SSI code, timing
- servo robot, observe IC outputs, collect data on velocity, matlab analysis
mon may 3
- 3 hrs - meet with HH and GG re SM
tue may 4
- 15 min - discuss FF with DG
- 15 min w/HH
wed may 5
- 11am to 10pm working on RLS
thur may 6
- 8:45a -
- 10 hrs
- RMB replacement design.
- on w/CA on details of how to have wire leave the PCA
fri may 7
- 12 hrs
- discuss no-component areas of PCB w/CA and CW.
- re-layout
- finalize RMB desin that uses 16 bits bi-polar differential ADCs
- finalize the RMB replacement. submit PCBs for fab. need to submit silk screens