Difference between revisions of "Hours 1001"
From DIDEAS Wiki
m |
m |
||
Line 44: | Line 44: | ||
=thur jan 7= | =thur jan 7= | ||
+ | *15+20+20+1hr | ||
**dissguess w/RC robot problem and patent | **dissguess w/RC robot problem and patent | ||
**phone w/DG re LTF results | **phone w/DG re LTF results | ||
**phone w/GG re LTF an robot results | **phone w/GG re LTF an robot results | ||
**read patent proposal | **read patent proposal |
Revision as of 04:24, 8 January 2010
Jan 2010
todo
Mon Jan 4
- 9:30a - 3:10p -30
- prepare PSER1eb and PSER2hb
- layout inverter oscillator and complete two eddy current sensors PCBs
- panel and submit PCBs for fabrication
- 4pm - 7:30p -45
- discuss w/DG LTF status
- resubmit PCBs after project rejected.
- biquad filter research and implementation
- discuss w/RC LTF status (41 hz) and V2 status
todo
- LTF data analysis
- get V2 going
tue jan 5
- 10:30a-3pm -1:40
- biquad filter tested on linux, added support commands under tkcmdset
- converted LTF data from Dec30
- 3:30p - 9:40pm
- work with GG and CA on IMU programing, hardware diagnosis
- review LTF data with DG, experiment with LTF
wed jan 6
- 8am - 11:40a +60min
- review robo_config for ability to load/save tables
- develop test procedure for ED / GG to load / save EEPROM tables on Spld.
- discuss w/DG how to proceed w/LTF experiments and XP software requirements.
- complete integration of biquad.c into MC firmware, add prototypes to result in cleaner MC compile
- located tool to design biquad filter coeffs, designed 200 & 300 hz Bstop filters.
- 3pm - 11:25pm -30 +30
- run LTF w/DG
- tested biquad filter
- update LTF SC/MC
- ran sine sweeps and white noise.
- converted data emailed to DG
thur jan 7
- 15+20+20+1hr
- dissguess w/RC robot problem and patent
- phone w/DG re LTF results
- phone w/GG re LTF an robot results
- read patent proposal