* 12-6-08 : CEB tests drive, no response on any channel - all high - probably ground is open
 +
* 12-5-08 : robert repairs encoder - by replacing with encoder from frozen motor
 +
* 12-4-08 : problems with encoder, no pulses on channel b
 
* 11-28-08 : verified with +-1.5Amps
 
* 11-28-08 : verified with +-1.5Amps
  
 
=battery packs=
 
=battery packs=

Revision as of 22:26, 6 December 2008

PCB Hardware

system

ak1

ak2

ak3

pyramid

2

  • 12-3-08 : Installed on Proto3. SG gain needed to be reduced from 850 to 550.
  • 12-1-08 : Q&D test, connector seems good

3

  • 11-28-08 : May have been calibrated in OCT, current on test stand

4

  • 12-1-08 : Q&D test, connector seems good

5

  • 12-1-08 : operational on PROTO3. SG gain is 850.
  • 11-28-08 : to be tested. May have been calibrated in OCT

motor / assembly

drive 1

  • 11-28-08 : verified with +-1.5Amps

drive 2

drive 3

  • 11-1-08 : motor frozen

drive 4

drive 5

  • 12-6-08 : CEB tests drive, no response on any channel - all high - probably ground is open
  • 12-5-08 : robert repairs encoder - by replacing with encoder from frozen motor
  • 12-4-08 : problems with encoder, no pulses on channel b
  • 11-28-08 : verified with +-1.5Amps

battery packs