Lifefix log

From DIDEAS Wiki
Revision as of 01:06, 12 September 2009 by Ceb (talk | contribs)
Jump to: navigation, search
  • 09-09-11 21:00 - started long cycle test with belt thresh
  • 09-09-11 14:00 - loadwasher tightened
  • 09-09-11 03:00 - notice that LW has slipped - is no longer pre-loaded.
  • 09-09-11 00:10 - during belt stress test, LF runs away and max plantarflexes
  • 09-09-10 23:30 - replaced broken belt; three ball screw balls fall out (from yesterday's over extension)
  • 09-09-10 02:30 - stopped due to broken belt (3600 cycles)
  • 09-09-10 00:30 - started, 30 cycles per min, full amplitude on drive motor, thrust scale=3000N
  • 09-09-10 20:00 - resonance experiments of inside only - excessive dorsiflexion
  • 09-09-10 16:00 - resonance experiments of full LF w/Kristin