Line 27: Line 27:
 
*09-09-10 20:00 - resonance experiments of inside only - excessive dors
 
*09-09-10 20:00 - resonance experiments of inside only - excessive dors
 
*09-09-10 16:00 - resonance experiments of full LF w/Kristin
 
*09-09-10 16:00 - resonance experiments of full LF w/Kristin
 +
 +
=LF_TEST_102=
 +
This is a reduced stress test.
 +
* 1500 N max thrust using : standard thrust vector file
 +
* belt thrash is only a DC current of 3 amps
 +
* appx 24 cycles per min, not sure why is so slow.
 +
* full amplitude back drive : copley PVT file - ceb_pvt_full_speed.txt
 +
  
 
=LF_TEST_101=
 
=LF_TEST_101=
 +
This is a very harsh stress test.
 
* appx 29 cyc per min
 
* appx 29 cyc per min
* has belt thresh
+
* has belt thrash
* full amplitude on drive motor
+
* full amplitude back drive : copley PVT file - ceb_pvt_full_speed.txt
* thrust scale=3000N
+
* 3000 N max thrust using : standard thrust vector file
  
 
=LF_TEST_100=
 
=LF_TEST_100=
 +
Normal thrust force, but no belt thrashing.
 
* appx 30 cyc per min
 
* appx 30 cyc per min
* full amplitude on drive motor
+
* full amplitude back drive : copley PVT file - ceb_pvt_full_speed.txt
* thrust scale=3000N
+
* 3000 N max thrust using : standard thrust vector file

Revision as of 21:26, 19 September 2009

PF Users Navigation:

Edit

LF #1 LOG

  • 09-09-19 16:13 - start with LF_TEST102
  • 09-09-19 16:12 - complete 217 passes of LF_TEST102
  • 09-09-19 16:02 - complete 582 passes of LF_TEST102
  • 09-09-19 15:30 - complete 2175 passes of LF_TEST102, stopped for code development,
  • 09-09-19 14:10 - start with LF_TEST102
  • 09-09-19 09:55 - completed 13812 passes of LF_TEST102 , stopped due to false positive belt break
  • 09-09-19 01:37 - start with LF_TEST102
  • 09-09-17 10:00 - restarted but stopped due to broken bolt after 44 cycles
  • 09-09-17 09:00 - stopped due to annoying neighbors.
  • 09-09-17 04:40 - started 10000 passes
  • 09-09-17 04:30 - started 237 passes
  • 09-09-17 03:30 - ran a few hundred cycles during experiments.
  • 09-09-17 03:00 - 3 incidences of max plantar, and re-phased the motor current
  • 09-09-11 23:53 - completed 4969 passes of LF_TEST_101 stops to belt break, ball nut on floor, load washer hanging
  • 09-09-11 21:00 - started LF_TEST_101
  • 09-09-11 14:00 - LW tightened
  • 09-09-11 03:00 - notice that LW has slipped - is no longer pre-loaded.
  • 09-09-11 00:10 - during belt stress test, LF runs away and max plantar
  • 09-09-10 23:30 - replaced broken belt; three ball screw balls fall out (from yesterday's over extension)
  • 09-09-10 02:30 - complete ~3600 passes of [[LF_TEST100], stopped due to broken belt
  • 09-09-10 00:30 - started LF_TEST100
  • 09-09-10 20:00 - resonance experiments of inside only - excessive dors
  • 09-09-10 16:00 - resonance experiments of full LF w/Kristin

LF_TEST_102

This is a reduced stress test.

  • 1500 N max thrust using : standard thrust vector file
  • belt thrash is only a DC current of 3 amps
  • appx 24 cycles per min, not sure why is so slow.
  • full amplitude back drive : copley PVT file - ceb_pvt_full_speed.txt


LF_TEST_101

This is a very harsh stress test.

  • appx 29 cyc per min
  • has belt thrash
  • full amplitude back drive : copley PVT file - ceb_pvt_full_speed.txt
  • 3000 N max thrust using : standard thrust vector file

LF_TEST_100

Normal thrust force, but no belt thrashing.

  • appx 30 cyc per min
  • full amplitude back drive : copley PVT file - ceb_pvt_full_speed.txt
  • 3000 N max thrust using : standard thrust vector file