todo

  • get to the bottom of the encoder drift (run bench test)
  • capture JR3 data from LTF while running
  • program to verify LTF operation (automated)
  • teach CA to run the benchtest.
  • fabricate more SWIFI PCBs
  • IMU ECOs.

RIC todo

  • update SWIFI firmware on S4.
  • email calb data to RIC


MAR 2010

mon mar 1

  • 30 mins emails re firmware and config w/GG, multiple LTF plan w/GG
  • admin for severl hrs.
  • 3:45pm - 6:45p
  • discuss w/DG LTF2, and moving to back.
  • work w/CA to get LTF2 back on network
  • discuss new network architecture for swifis (lab net) and BSt. w/ED
  • email w/GG re building

  • 1.5 hrs.
  • drive to microcenter.
  • experment with new accesspoint
  • setup dd-wrt

tue mar 2

2:30pm - 6:50p

  • continue access point config
  • setup PC at bineny
  • setup LTF, get views working
  • discuss network and AP w/ED

8pm-9:40pm

  • investigate LTF network issue
  • setup VPN at Binney

wed mar 3

  • 11a - 6:10p
    • work with LTF1 and DG to determine cause of excessive temperature rise
    • cause traced to apparent encoder drift.

thur mar 4

  • 8.45a - 11:40a
    • experiments with LTF1 to confirm encoder drift.
    • modify plot_ltf to support viewing of new experiment data.
    • email DG re LTF1 status and plan
  • 4:50p - 9:10p, -25m
    • reviewed status of WIP4d for submission
    • discuss w/GG MIT ankle requirements.
    • work w/DG to diagnose LTF1 motor encoder failure
    • improve plot_ltf

fri mar 5

  • 8:30a - 1pm (-30m)
    • restart LTF1, study the cause of the stoppage, investigate RLFv2 for untrapped errors and fix.
    • coordination with DG re LTF
    • update RC w/status of LTF and next week.
    • email to RC, HH re situation

mon mar 8

  • 1:45p-2:50p
    • prepare AP DD-WRT for lab, test w/S5
  • 6p-7p
    • discuss robot status with GG
    • test pser2h-b, find component not installed, CA installs and SN #1-3 tested successfully, to be delivered to MIT.
  • 9:15p-10:40p
    • phone ED re issues with LTF1
    • update ip devices wiki w/ Binney network info.
    • test communications with S3 and L5
    • debug LTF1, assign network device address, get vncserver working.
    • go to Binney to looking to problems with LTF1, insert JR3 cable, still no comedi device

tue mar 9

  • 8am-
  • review GG robot torque / beta code
  • bring up LTF1, problems with running hot and lack of thrust
  • -3:20p

wed mar 10

  • 9a-
    • review LTF1, save plots for encoder drift