CalibFix Users

From DIDEAS Wiki
Revision as of 19:54, 9 November 2009 by Ggirzon (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Calibration Fixture

PowerFoot Calibration Procedure

  1. First time cycle encoder board
  2. Zero mechanical
  3. Check Firmware Revision using PF_CMD
    1. Check State Controller (SC)
    2. Check Motor Controller (MC)
  4. Zero backdrive motor via EPOS UI
    1. Run EPOS program
    2. Status -> Reset Node
    3. Clear Errors
    4. Enable EPOS and check for green light
  5. Run TestJig
    1. TestJig: Zero Angle
      1. Move to position 0
      2. Zero
      3. Move to position 20000
      4. Move to position -20000
      5. Move to position 0
      6. Zero
      7. Repeat 20000, -20000, 0, ZERO several times
    2. TestJig: Parallel Spring Test
      1. Turn off Data Query
      2. Set the following parameters (others leave at 0)
        1. Sampling Rate 100
        2. Duration 3000
        3. Initial 64000
        4. Final -38000
        5. Passes 20
        6. Accel 0.6
        7. Decel 0.3
        8. RPM 22
      3. Test should run for ~45 minutes
    3. TestJig: Series Spring Test